Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
10.0 min
Lead Time (LT)
8.29 d
Value-Added
38.3 min
Efficiency (PCE)
1.03%
BottleneckLow-Voltage 24V LED Harness
31 < 45/day
Limit: downtime
Quality (RTY)
88.2%
WIP Capital
€217,710
Carbon CO₂
22.6 t CO₂e/year