Plant Operator Forklift & LOTO Annual Recert

Product family: Zero-Lapse Compliance Track.

Flow: Accredited Safety Trainers → 60-Day Expiry Alert Trigger → E-Learning Theory Module → Floor Practical Drive Eval → HSE Instructor Sign-Off → Badge RFID Machine Unlock → Plant HSE Directors

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Plant Operator Forklift & LOTO Annual RecertSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Accredited Safety Trainers → 60-Day Expiry Alert Trigger (192 s) → E-Learning Theory Module (240 s) → Floor Practical Drive Eval (321 s) → HSE Instructor Sign-Off (204 s) → Badge RFID Machine Unlock (150 s) → Plant HSE Directors.SUPPLIERAccreditedSafety TrainersI1.60 d160-Day ExpiryAlert TriggerC/T 192 sI2.00 d2E-Learning TheoryModuleC/T 240 sI2.80 d3Floor PracticalDrive EvalC/T 321 sI0.80 d4HSE InstructorSign-OffC/T 204 sI0.50 d5Badge RFIDMachine UnlockC/T 150 sI0.60 dCUSTOMERPlant HSEDirectors90 / files

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. 60-Day Expiry Alert Trigger192 s10 min96%92.0%23144 (1.60 d)113
2. E-Learning Theory Module240 s15 min93%94.5%23180 (2.00 d)86
3. Floor Practical Drive Eval321 s25 min86%88.0%18252 (2.80 d)46
4. HSE Instructor Sign-Off204 s5 min97%97.6%972 (0.80 d)111
5. Badge RFID Machine Unlock150 s3 min99%99.1%945 (0.50 d)165

Key figures

Takt time
300 s
Lead time
8.34 d
Value-added time
1,107 s
Process cycle efficiency (PCE)
0.49%
Rolled throughput yield (RTY)
74.0%
Customer demand per day
90 files
Line capacity per day
46 files
Bottleneck
Floor Practical Drive Eval

Reading the bottleneck

The bottleneck is "Floor Practical Drive Eval": it can process 46 files per day against a demand of 90 files, so it falls short of demand by 48.9%. Once downtime and scrap are counted, its cycle time grows from 321 s to 424 s, against a takt of 300 s. The largest loss at this step is changeovers (25 min every 18 units), about 83.3 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.