Plant Operator Forklift & LOTO Annual Recert
Product family: Zero-Lapse Compliance Track.
Flow: Accredited Safety Trainers → 60-Day Expiry Alert Trigger → E-Learning Theory Module → Floor Practical Drive Eval → HSE Instructor Sign-Off → Badge RFID Machine Unlock → Plant HSE Directors
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. 60-Day Expiry Alert Trigger | 192 s | 10 min | 96% | 92.0% | 23 | 144 (1.60 d) | 113 |
| 2. E-Learning Theory Module | 240 s | 15 min | 93% | 94.5% | 23 | 180 (2.00 d) | 86 |
| 3. Floor Practical Drive Eval | 321 s | 25 min | 86% | 88.0% | 18 | 252 (2.80 d) | 46 |
| 4. HSE Instructor Sign-Off | 204 s | 5 min | 97% | 97.6% | 9 | 72 (0.80 d) | 111 |
| 5. Badge RFID Machine Unlock | 150 s | 3 min | 99% | 99.1% | 9 | 45 (0.50 d) | 165 |
Key figures
- Takt time
- 300 s
- Lead time
- 8.34 d
- Value-added time
- 1,107 s
- Process cycle efficiency (PCE)
- 0.49%
- Rolled throughput yield (RTY)
- 74.0%
- Customer demand per day
- 90 files
- Line capacity per day
- 46 files
- Bottleneck
- Floor Practical Drive Eval
Reading the bottleneck
The bottleneck is "Floor Practical Drive Eval": it can process 46 files per day against a demand of 90 files, so it falls short of demand by 48.9%. Once downtime and scrap are counted, its cycle time grows from 321 s to 424 s, against a takt of 300 s. The largest loss at this step is changeovers (25 min every 18 units), about 83.3 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Human Resources, Hiring & People Ops: Human Resources, Hiring & People Ops
- Talent Acquisition & Day-1 Onboarding
- Corporate Expat Work Permit & Relocation Desk
- Contingent Tech Contractor VMS Sourcing Flow
- Secure Employee Offboarding & Asset Recovery
- University Graduate Assessment Center Batch Day
- 24/7 Factory 3-Shift Dynamic Workforce Rostering
- C-Suite & VP Executive Retained Search Cycle
- Annual Merit, Bonus & Performance Calibration
- ISO 37002 Ethics & Whistleblower Case Triage
- International Executive Visa & Travel Desk Flow
- Annual Role Grading & Market Salary Survey Flow