Litigation Hold & Legal eDiscovery Review Desk

Product family: Privilege-Tagged Evidence Sets.

Flow: Collaboration Suite / Email Vaults → Legal Hold Custodians Lock → Forensic PST Collection & De-Dup → TAR Predictive Privilege Review → Privilege Log QC Inspection → Opposing Counsel Bates Produce → Outside Trial Counsel

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Litigation Hold & Legal eDiscovery Review DeskSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Collaboration Suite / Email Vaults → Legal Hold Custodians Lock (1,046 s) → Forensic PST Collection & De-Dup (1,350 s) → TAR Predictive Privilege Review (1,823 s) → Privilege Log QC Inspection (1,148 s) → Opposing Counsel Bates Produce (759 s) → Outside Trial Counsel.SUPPLIERCollaborationSuite / EmailVaultsI1.38 d1Legal HoldCustodians LockC/T 1,046 sI1.81 d2Forensic PSTCollection &…C/T 1,350 sI3.50 d3TAR PredictivePrivilege ReviewC/T 1,823 sI0.88 d4Privilege Log QCInspectionC/T 1,148 sI0.38 d5Opposing CounselBates ProduceC/T 759 sI0.31 dCUSTOMEROutside TrialCounsel16 / cases

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Legal Hold Custodians Lock1,046 s5 min97%91.5%422 (1.38 d)22
2. Forensic PST Collection & De-Dup1,350 s8 min93%94.0%429 (1.81 d)16
3. TAR Predictive Privilege Review1,823 s12 min85%89.0%356 (3.50 d)10
4. Privilege Log QC Inspection1,148 s4 min96%97.8%214 (0.88 d)21
5. Opposing Counsel Bates Produce759 s2 min99%99.5%26 (0.38 d)34

Key figures

Takt time
1,688 s
Lead time
8.48 d
Value-added time
6,126 s
Process cycle efficiency (PCE)
2.7%
Rolled throughput yield (RTY)
74.5%
Customer demand per day
16 cases
Line capacity per day
10 cases
Bottleneck
TAR Predictive Privilege Review

Reading the bottleneck

The bottleneck is "TAR Predictive Privilege Review": it can process 10 cases per day against a demand of 16 cases, so it falls short of demand by 39.9%. Once downtime and scrap are counted, its cycle time grows from 1,823 s to 2,410 s, against a takt of 1,688 s. The largest loss at this step is equipment downtime (uptime 85%), about 322 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Legal Ops, Contracts, IP & Tenders: Legal Ops, Contracts, IP & Tenders