CapEx Project Activation & Fixed Asset Depreciation

Product family: Manufacturing Asset Capitalize.

Flow: Engineering CapEx Leads → CapEx WBS Spend Audit → Plant Acceptance Cert Check → Asset Class & Useful Life Tag → Settlement AuC to Fixed Asset → Monthly Depreciation Posting → Plant Controllers

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: CapEx Project Activation & Fixed Asset DepreciationSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Engineering CapEx Leads → CapEx WBS Spend Audit (396 s) → Plant Acceptance Cert Check (468 s) → Asset Class & Useful Life Tag (642 s) → Settlement AuC to Fixed Asset (384 s) → Monthly Depreciation Posting (300 s) → Plant Controllers.SUPPLIEREngineeringCapEx LeadsI1.40 d1CapEx WBS SpendAuditC/T 396 sI1.51 d2Plant AcceptanceCert CheckC/T 468 sI2.91 d3Asset Class &Useful Life TagC/T 642 sI0.91 d4Settlement AuC toFixed AssetC/T 384 sI0.51 d5MonthlyDepreciation…C/T 300 sI0.51 dCUSTOMERPlantControllers45 / files

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. CapEx WBS Spend Audit396 s2 min96%89.5%1163 (1.40 d)58
2. Plant Acceptance Cert Check468 s2 min95%93.8%1168 (1.51 d)50
3. Asset Class & Useful Life Tag642 s8 min86%89.0%9131 (2.91 d)29
4. Settlement AuC to Fixed Asset384 s3 min97%98.4%941 (0.91 d)65
5. Monthly Depreciation Posting300 s2 min99%99.1%723 (0.51 d)86

Key figures

Takt time
600 s
Lead time
7.84 d
Value-added time
2,190 s
Process cycle efficiency (PCE)
1.0%
Rolled throughput yield (RTY)
72.9%
Customer demand per day
45 files
Line capacity per day
29 files
Bottleneck
Asset Class & Useful Life Tag

Reading the bottleneck

The bottleneck is "Asset Class & Useful Life Tag": it can process 29 files per day against a demand of 45 files, so it falls short of demand by 34.8%. Once downtime and scrap are counted, its cycle time grows from 642 s to 839 s, against a takt of 600 s. The largest loss at this step is equipment downtime (uptime 86%), about 105 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Order-to-Cash, P2P & Shared Services: Order-to-Cash, P2P & Shared Services