Institutional MPC Cold-Wallet Custody Withdrawal

Product family: Multi-Quorum Digital Asset Ops.

Flow: Client Whitelisted Addresses → Policy Engine Amount Check → Blockchain Analytics KYT Source Audit → Hardware Cold-Quorum Video → MPC Shard Ceremony Sign → On-Chain Finality Confirm → Crypto Funds & Family Offices

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Institutional MPC Cold-Wallet Custody WithdrawalSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Client Whitelisted Addresses → Policy Engine Amount Check (532 s) → Blockchain Analytics KYT Source Audit (631 s) → Hardware Cold-Quorum Video (889 s) → MPC Shard Ceremony Sign (582 s) → On-Chain Finality Confirm (399 s) → Crypto Funds & Family Offices.SUPPLIERClientWhitelistedAddressesI1.20 d1Policy EngineAmount CheckC/T 532 sI1.40 d2BlockchainAnalytics KYT…C/T 631 sI2.80 d3HardwareCold-Quorum VideoC/T 889 sI0.80 d4MPC ShardCeremony SignC/T 582 sI0.40 d5On-Chain FinalityConfirmC/T 399 sI0.40 dCUSTOMERCrypto Funds &Family Offices65 / files

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Policy Engine Amount Check532 s3 min97%92.5%1378 (1.20 d)90
2. Blockchain Analytics KYT Source Audit631 s4 min95%90.0%1391 (1.40 d)72
3. Hardware Cold-Quorum Video889 s8 min86%89.5%13182 (2.80 d)45
4. MPC Shard Ceremony Sign582 s5 min96%97.6%1052 (0.80 d)84
5. On-Chain Finality Confirm399 s2 min99%99.4%726 (0.40 d)130

Key figures

Takt time
831 s
Lead time
7.06 d
Value-added time
3,033 s
Process cycle efficiency (PCE)
0.80%
Rolled throughput yield (RTY)
72.3%
Customer demand per day
65 files
Line capacity per day
45 files
Bottleneck
Hardware Cold-Quorum Video

Reading the bottleneck

The bottleneck is "Hardware Cold-Quorum Video": it can process 45 files per day against a demand of 65 files, so it falls short of demand by 31.3%. Once downtime and scrap are counted, its cycle time grows from 889 s to 1,155 s, against a takt of 831 s. The largest loss at this step is equipment downtime (uptime 86%), about 145 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.