CSRD Scope 1-3 ESG Bond & Audit Assurance

Product family: External Limited Assurance Flow.

Flow: Plant Utility & Travel Logs → Activity Data ERP Ingestion → Emission Factor Match Check → Missing Utility Estimation Fix → Big-4 Auditor Evidence Sample → CSRD Statutory Report Sign → Institutional ESG Investors

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: CSRD Scope 1-3 ESG Bond & Audit AssuranceSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Plant Utility & Travel Logs → Activity Data ERP Ingestion (1,440 s) → Emission Factor Match Check (1,710 s) → Missing Utility Estimation Fix (2,408 s) → Big-4 Auditor Evidence Sample (1,575 s) → CSRD Statutory Report Sign (1,080 s) → Institutional ESG Investors.SUPPLIERPlant Utility &Travel LogsI1.17 d1Activity Data ERPIngestionC/T 1,440 sI1.42 d2Emission FactorMatch CheckC/T 1,710 sI2.83 d3Missing UtilityEstimation FixC/T 2,408 sI0.83 d4Big-4 AuditorEvidence SampleC/T 1,575 sI0.42 d5CSRD StatutoryReport SignC/T 1,080 sI0.42 dCUSTOMERInstitutionalESG Investors12 / cases

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Activity Data ERP Ingestion1,440 s3 min97%92.5%214 (1.17 d)16
2. Emission Factor Match Check1,710 s4 min95%90.0%217 (1.42 d)13
3. Missing Utility Estimation Fix2,408 s8 min86%89.5%234 (2.83 d)8
4. Big-4 Auditor Evidence Sample1,575 s5 min96%97.6%210 (0.83 d)15
5. CSRD Statutory Report Sign1,080 s2 min99%99.4%15 (0.42 d)24

Key figures

Takt time
2,250 s
Lead time
7.39 d
Value-added time
8,213 s
Process cycle efficiency (PCE)
4.1%
Rolled throughput yield (RTY)
72.3%
Customer demand per day
12 cases
Line capacity per day
8 cases
Bottleneck
Missing Utility Estimation Fix

Reading the bottleneck

The bottleneck is "Missing Utility Estimation Fix": it can process 8 cases per day against a demand of 12 cases, so it falls short of demand by 35.8%. Once downtime and scrap are counted, its cycle time grows from 2,408 s to 3,128 s, against a takt of 2,250 s. The largest loss at this step is equipment downtime (uptime 86%), about 392 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Wealth Mgmt, KYC, AML & Audit: Wealth Mgmt, KYC, AML & Audit