Cross-Border SWIFT Wire Repair & OFAC Queue
Product family: ISO-20022 Payment Exceptions.
Flow: Correspondent Wire Feeds → Malformed BIC/IBAN Auto-Parse → Sanctions False-Hit Review → Dual-Control Ops Repair → OFAC Hold Release Sign-Off → Fedwire / TARGET2 Clearing → Corporate Wire Originators
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Malformed BIC/IBAN Auto-Parse | 119 s | 3 min | 97% | 92.5% | 58 | 348 (1.20 d) | 400 |
| 2. Sanctions False-Hit Review | 142 s | 4 min | 95% | 90.0% | 58 | 406 (1.40 d) | 318 |
| 3. Dual-Control Ops Repair | 199 s | 8 min | 86% | 89.5% | 58 | 812 (2.80 d) | 200 |
| 4. OFAC Hold Release Sign-Off | 130 s | 5 min | 96% | 97.6% | 44 | 232 (0.80 d) | 375 |
| 5. Fedwire / TARGET2 Clearing | 89.0 s | 2 min | 99% | 99.4% | 29 | 116 (0.40 d) | 584 |
Key figures
- Takt time
- 186 s
- Lead time
- 7.01 d
- Value-added time
- 679 s
- Process cycle efficiency (PCE)
- 0.18%
- Rolled throughput yield (RTY)
- 72.3%
- Customer demand per day
- 290 files
- Line capacity per day
- 200 files
- Bottleneck
- Dual-Control Ops Repair
Reading the bottleneck
The bottleneck is "Dual-Control Ops Repair": it can process 200 files per day against a demand of 290 files, so it falls short of demand by 31.2%. Once downtime and scrap are counted, its cycle time grows from 199 s to 259 s, against a takt of 186 s. The largest loss at this step is equipment downtime (uptime 86%), about 32.4 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Wealth Mgmt, KYC, AML & Audit: Wealth Mgmt, KYC, AML & Audit
- Instant Video-Ident Digital Bank Account Onboarding
- Transaction Monitoring AML Alert & SAR Filing
- Daily T+0 Mutual Fund & ETF NAV Valuation Close
- Merchant Card Fraud & Chargeback Representment
- M&A Buy-Side Financial & Legal Due Diligence
- Private Client Tax-Loss Harvest Portfolio Rebalance
- SMB Payment Gateway & POS Merchant Underwriting
- Institutional MPC Cold-Wallet Custody Withdrawal
- CSRD Scope 1-3 ESG Bond & Audit Assurance
- Equity Capital Markets IPO Prospectus & Filing
- Real-Time Card Fraud Dispute & Card Reissue