iOS & Android Banking Mobile App Release Train

Product family: Bi-Weekly Store Releases.

Flow: Mobile Product Tribe → API Contract Freeze → Feature Branch & Snapshot → Device Lab Regression → Mobile Store Review → Phased 1-100% Flag Rollout → 6M Mobile Banking Users

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: iOS & Android Banking Mobile App Release TrainSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Mobile Product Tribe → API Contract Freeze (419 s) → Feature Branch & Snapshot (567 s) → Device Lab Regression (378 s) → Mobile Store Review (722 s) → Phased 1-100% Flag Rollout (284 s) → 6M Mobile Banking Users.SUPPLIERMobile ProductTribeI2.20 d1API ContractFreezeC/T 419 sI1.80 d2Feature Branch &SnapshotC/T 567 sI1.40 d3Device LabRegressionC/T 378 sI2.40 d4Mobile StoreReviewC/T 722 sI0.70 d5Phased 1-100%Flag RolloutC/T 284 sI0.80 dCUSTOMER6M MobileBanking Users40 / tickets

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. API Contract Freeze419 s15 min96%91.0%2088 (2.20 d)53
2. Feature Branch & Snapshot567 s12 min92%88.5%1672 (1.80 d)36
3. Device Lab Regression378 s5 min95%93.0%856 (1.40 d)60
4. Mobile Store Review722 s35 min88%86.0%4096 (2.40 d)26
5. Phased 1-100% Flag Rollout284 s8 min98%97.5%428 (0.70 d)75

Key figures

Takt time
675 s
Lead time
9.39 d
Value-added time
2,370 s
Process cycle efficiency (PCE)
0.94%
Rolled throughput yield (RTY)
62.8%
Customer demand per day
40 tickets
Line capacity per day
26 tickets
Bottleneck
Mobile Store Review

Reading the bottleneck

The bottleneck is "Mobile Store Review": it can process 26 tickets per day against a demand of 40 tickets, so it falls short of demand by 34.7%. Once downtime and scrap are counted, its cycle time grows from 722 s to 954 s, against a takt of 675 s. The largest loss at this step is scrap and rework (first-pass yield 86.0%), about 134 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.