Multi-Region Cloud Landing Zone Terraform IaC

Product family: Compliant Infrastructure-as-Code.

Flow: Platform Dev Squads → PR Plan Diff & Cost Estimate → OPA / Checkov Policy Gate → SecOps IAM Escalate Check → Ephemeral Env Apply & Smoke → Prod State Apply & Drift Lock → Public Cloud App Clusters

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Multi-Region Cloud Landing Zone Terraform IaCSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Platform Dev Squads → PR Plan Diff & Cost Estimate (372 s) → OPA / Checkov Policy Gate (504 s) → SecOps IAM Escalate Check (336 s) → Ephemeral Env Apply & Smoke (642 s) → Prod State Apply & Drift Lock (252 s) → Public Cloud App Clusters.SUPPLIERPlatform DevSquadsI2.20 d1PR Plan Diff &Cost EstimateC/T 372 sI1.80 d2OPA / CheckovPolicy GateC/T 504 sI1.40 d3SecOps IAMEscalate CheckC/T 336 sI2.40 d4Ephemeral EnvApply & SmokeC/T 642 sI0.69 d5Prod State Apply& Drift LockC/T 252 sI0.80 dCUSTOMERPublic CloudApp Clusters45 / tickets

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. PR Plan Diff & Cost Estimate372 s15 min96%91.0%2399 (2.20 d)59
2. OPA / Checkov Policy Gate504 s12 min92%88.5%1881 (1.80 d)41
3. SecOps IAM Escalate Check336 s5 min95%93.0%963 (1.40 d)67
4. Ephemeral Env Apply & Smoke642 s35 min88%86.0%45108 (2.40 d)29
5. Prod State Apply & Drift Lock252 s8 min98%97.5%531 (0.69 d)86

Key figures

Takt time
600 s
Lead time
9.37 d
Value-added time
2,106 s
Process cycle efficiency (PCE)
0.83%
Rolled throughput yield (RTY)
62.8%
Customer demand per day
45 tickets
Line capacity per day
29 tickets
Bottleneck
Ephemeral Env Apply & Smoke

Reading the bottleneck

The bottleneck is "Ephemeral Env Apply & Smoke": it can process 29 tickets per day against a demand of 45 tickets, so it falls short of demand by 34.8%. Once downtime and scrap are counted, its cycle time grows from 642 s to 848 s, against a takt of 600 s. The largest loss at this step is scrap and rework (first-pass yield 86.0%), about 119 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.