ERP Monthly Release & Transport Train

Product family: Enterprise ERP Release.

Flow: Functional ERP Consultants → Dev Unit & ATC Code Check → QAS Integration & Automated Test → Cross-Plant Regression UAT → CAB Cutover Window Sign → Prod Import & Batch Job Check → 30 Global Factory Plants

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: ERP Monthly Release & Transport TrainSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Functional ERP Consultants → Dev Unit & ATC Code Check (523 s) → QAS Integration & Automated Test (709 s) → Cross-Plant Regression UAT (473 s) → CAB Cutover Window Sign (903 s) → Prod Import & Batch Job Check (354 s) → 30 Global Factory Plants.SUPPLIERFunctional ERPConsultantsI2.19 d1Dev Unit & ATCCode CheckC/T 523 sI1.81 d2QAS Integration &Automated TestC/T 709 sI1.41 d3Cross-PlantRegression UATC/T 473 sI2.41 d4CAB CutoverWindow SignC/T 903 sI0.69 d5Prod Import &Batch Job CheckC/T 354 sI0.81 dCUSTOMER30 GlobalFactory Plants32 / tickets

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Dev Unit & ATC Code Check523 s15 min96%91.0%1670 (2.19 d)42
2. QAS Integration & Automated Test709 s12 min92%88.5%1358 (1.81 d)29
3. Cross-Plant Regression UAT473 s5 min95%93.0%645 (1.41 d)47
4. CAB Cutover Window Sign903 s35 min88%86.0%3277 (2.41 d)21
5. Prod Import & Batch Job Check354 s8 min98%97.5%322 (0.69 d)59

Key figures

Takt time
844 s
Lead time
9.42 d
Value-added time
2,962 s
Process cycle efficiency (PCE)
1.2%
Rolled throughput yield (RTY)
62.8%
Customer demand per day
32 tickets
Line capacity per day
21 tickets
Bottleneck
CAB Cutover Window Sign

Reading the bottleneck

The bottleneck is "CAB Cutover Window Sign": it can process 21 tickets per day against a demand of 32 tickets, so it falls short of demand by 34.8%. Once downtime and scrap are counted, its cycle time grows from 903 s to 1,193 s, against a takt of 844 s. The largest loss at this step is scrap and rework (first-pass yield 86.0%), about 167 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Software Delivery & CI/CD DevOps: Software Delivery & CI/CD DevOps