Satellite-Triggered Parametric Crop Drought Payout

Product family: Zero-Adjuster Index Claims.

Flow: NASA/ESA Soil Moisture Feeds → Satellite Drought Trigger Alert → Smart Contract Parcel Verify → Threshold Deviation QA Check → Automated Indemnity Ledger → Direct Mobile Payout 48h → Smallholder Agri Co-ops

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Satellite-Triggered Parametric Crop Drought PayoutSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. NASA/ESA Soil Moisture Feeds → Satellite Drought Trigger Alert (115 s) → Smart Contract Parcel Verify (132 s) → Threshold Deviation QA Check (182 s) → Automated Indemnity Ledger (115 s) → Direct Mobile Payout 48h (76.0 s) → Smallholder Agri Co-ops.SUPPLIERNASA/ESA SoilMoisture FeedsI1.40 d1Satellite DroughtTrigger AlertC/T 115 sI1.80 d2Smart ContractParcel VerifyC/T 132 sI3.40 d3ThresholdDeviation QA…C/T 182 sI0.80 d4AutomatedIndemnity LedgerC/T 115 sI0.40 d5Direct MobilePayout 48hC/T 76.0 sI0.40 dCUSTOMERSmallholderAgri Co-ops160 / claims

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Satellite Drought Trigger Alert115 s3 min97%88.0%32224 (1.40 d)194
2. Smart Contract Parcel Verify132 s5 min94%93.5%40288 (1.80 d)172
3. Threshold Deviation QA Check182 s10 min86%89.0%40544 (3.40 d)103
4. Automated Indemnity Ledger115 s4 min96%97.4%16128 (0.80 d)200
5. Direct Mobile Payout 48h76.0 s2 min99%99.1%1664 (0.40 d)333

Key figures

Takt time
169 s
Lead time
8.22 d
Value-added time
620 s
Process cycle efficiency (PCE)
0.28%
Rolled throughput yield (RTY)
70.7%
Customer demand per day
160 claims
Line capacity per day
103 claims
Bottleneck
Threshold Deviation QA Check

Reading the bottleneck

The bottleneck is "Threshold Deviation QA Check": it can process 103 claims per day against a demand of 160 claims, so it falls short of demand by 35.3%. Once downtime and scrap are counted, its cycle time grows from 182 s to 238 s, against a takt of 169 s. The largest loss at this step is equipment downtime (uptime 86%), about 29.6 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Insurance Claims & Policy Ops: Insurance Claims & Policy Ops