Pet Veterinary Illness Claim Optical Receipt Flow
Product family: 24-Hr Vet Bill Payout.
Flow: Veterinary Clinic Invoices → Mobile Photo Vet Invoice → Pre-Existing Record History Scan → Veterinary Nurse Code Audit → Co-Insurance Deductible Calc → Instant ACH Reimbursement → Insured Pet Parents
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Mobile Photo Vet Invoice | 66.0 s | 3 min | 97% | 88.0% | 56 | 392 (1.40 d) | 338 |
| 2. Pre-Existing Record History Scan | 75.0 s | 5 min | 94% | 93.5% | 70 | 504 (1.80 d) | 302 |
| 3. Veterinary Nurse Code Audit | 104 s | 10 min | 86% | 89.0% | 70 | 952 (3.40 d) | 181 |
| 4. Co-Insurance Deductible Calc | 66.0 s | 4 min | 96% | 97.4% | 28 | 224 (0.80 d) | 349 |
| 5. Instant ACH Reimbursement | 43.0 s | 2 min | 99% | 99.1% | 28 | 112 (0.40 d) | 589 |
Key figures
- Takt time
- 96.4 s
- Lead time
- 8.21 d
- Value-added time
- 354 s
- Process cycle efficiency (PCE)
- 0.16%
- Rolled throughput yield (RTY)
- 70.7%
- Customer demand per day
- 280 claims
- Line capacity per day
- 181 claims
- Bottleneck
- Veterinary Nurse Code Audit
Reading the bottleneck
The bottleneck is "Veterinary Nurse Code Audit": it can process 181 claims per day against a demand of 280 claims, so it falls short of demand by 35.3%. Once downtime and scrap are counted, its cycle time grows from 104 s to 136 s, against a takt of 96.4 s. The largest loss at this step is equipment downtime (uptime 86%), about 16.9 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Insurance Claims & Policy Ops: Insurance Claims & Policy Ops
- Property & Auto Insurance Claims Flow
- Group Health Medical Claim TPA Reimbursement
- Ocean Marine Cargo Damage & General Average Claim
- Enterprise Cyber Ransomware Incident & Claim Triage
- Workers Compensation Injury & Return-to-Work Case
- Mid-Market Commercial Property & Liability Quote
- Term & Whole Life Policy Paramedical Underwriting
- Satellite-Triggered Parametric Crop Drought Payout
- Automated Flight-Delay Parametric Travel Claim
- Construction Performance & Bid Surety Bond Desk
- Quarterly Reinsurance Treaty Bordereaux & Settlement