International Import Letter of Credit (LC) Issue

Product family: UCP 600 Bank Guarantees.

Flow: Interbank Messaging Network & Chamber → SWIFT MT700 Application In → Sanctions & Dual-Use Vessel Check → Discrepancy Document Examination → Correspondent Bank Confirm → Trade Settlement Acceptance → Import/Export Corporates

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: International Import Letter of Credit (LC) IssueSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Interbank Messaging Network & Chamber → SWIFT MT700 Application In (266 s) → Sanctions & Dual-Use Vessel Check (324 s) → Discrepancy Document Examination (444 s) → Correspondent Bank Confirm (258 s) → Trade Settlement Acceptance (174 s) → Import/Export Corporates.SUPPLIERInterbankMessagingNetwork &…I1.80 d1SWIFT MT700Application InC/T 266 sI1.60 d2Sanctions &Dual-Use Vessel…C/T 324 sI3.20 d3DiscrepancyDocument…C/T 444 sI1.00 d4CorrespondentBank ConfirmC/T 258 sI0.51 d5Trade SettlementAcceptanceC/T 174 sI0.51 dCUSTOMERImport/ExportCorporates65 / files

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. SWIFT MT700 Application In266 s5 min96%86.0%16117 (1.80 d)80
2. Sanctions & Dual-Use Vessel Check324 s8 min94%91.5%16104 (1.60 d)66
3. Discrepancy Document Examination444 s12 min86%88.0%13208 (3.20 d)40
4. Correspondent Bank Confirm258 s5 min97%96.5%765 (1.00 d)88
5. Trade Settlement Acceptance174 s2 min99%99.4%733 (0.51 d)146

Key figures

Takt time
415 s
Lead time
8.67 d
Value-added time
1,466 s
Process cycle efficiency (PCE)
0.63%
Rolled throughput yield (RTY)
66.4%
Customer demand per day
65 files
Line capacity per day
40 files
Bottleneck
Discrepancy Document Examination

Reading the bottleneck

The bottleneck is "Discrepancy Document Examination": it can process 40 files per day against a demand of 65 files, so it falls short of demand by 38.6%. Once downtime and scrap are counted, its cycle time grows from 444 s to 587 s, against a takt of 415 s. The largest loss at this step is equipment downtime (uptime 86%), about 72.3 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Banking, Loans & Credit Underwriting: Banking, Loans & Credit Underwriting