Automated Pouch-Sorter Shoebox Distribution

Product family: Multi-Size Footwear Pull Hub.

Flow: Vietnam/PT Shoe Factories → Carton Induction & Pouch Load → Overhead Dynamic Pocket Matrix → Store / Web Size Sequence → Auto Box Packing & Void Fill → Carrier Bay Loading Belts → Retail & E-Com Drop

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Automated Pouch-Sorter Shoebox DistributionSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Vietnam/PT Shoe Factories → Carton Induction & Pouch Load (8.5 s) → Overhead Dynamic Pocket Matrix (11.1 s) → Store / Web Size Sequence (15.2 s) → Auto Box Packing & Void Fill (11.9 s) → Carrier Bay Loading Belts (7.4 s) → Retail & E-Com Drop.SUPPLIERVietnam/PT ShoeFactoriesI1.20 d1Carton Induction& Pouch LoadC/T 8.5 sI1.60 d2Overhead DynamicPocket MatrixC/T 11.1 sI1.10 d3Store / Web SizeSequenceC/T 15.2 sI0.70 d4Auto Box Packing& Void FillC/T 11.9 sI0.40 d5Carrier BayLoading BeltsC/T 7.4 sI0.50 dCUSTOMERRetail & E-ComDrop3,800 / orders

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Carton Induction & Pouch Load8.5 s15 min95%98.8%1,9004,560 (1.20 d)5,764
2. Overhead Dynamic Pocket Matrix11.1 s10 min94%99.1%1,5206,080 (1.60 d)4,406
3. Store / Web Size Sequence15.2 s18 min89%96.9%1,1404,180 (1.10 d)2,860
4. Auto Box Packing & Void Fill11.9 s8 min93%98.4%7602,660 (0.70 d)3,968
5. Carrier Bay Loading Belts7.4 s12 min97%99.5%1,5201,520 (0.40 d)6,808

Key figures

Takt time
14.2 s
Lead time
5.50 d
Value-added time
54.1 s
Process cycle efficiency (PCE)
0.018%
Rolled throughput yield (RTY)
92.9%
Customer demand per day
3,800 orders
Line capacity per day
2,860 orders
Bottleneck
Store / Web Size Sequence

Reading the bottleneck

The bottleneck is "Store / Web Size Sequence": it can process 2,860 orders per day against a demand of 3,800 orders, so it falls short of demand by 24.7%. Once downtime and scrap are counted, its cycle time grows from 15.2 s to 17.6 s, against a takt of 14.2 s. The largest loss at this step is equipment downtime (uptime 89%), about 1.9 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.