Cube-Storage AS/RS Goods-to-Person Picking Cell

Product family: Goods-to-Person Port Orders.

Flow: Consumer Tech Wholesalers → Bin Decanting & Barcode → Robot Grid Cube Storage → Carousel Port Put-to-Light → Right-Size Automated Box → Sort Chute Parcel Carrier → D2C Online Customers

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Cube-Storage AS/RS Goods-to-Person Picking CellSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Consumer Tech Wholesalers → Bin Decanting & Barcode (11.6 s) → Robot Grid Cube Storage (15.0 s) → Carousel Port Put-to-Light (20.6 s) → Right-Size Automated Box (16.2 s) → Sort Chute Parcel Carrier (10.0 s) → D2C Online Customers.SUPPLIERConsumer TechWholesalersI1.20 d1Bin Decanting &BarcodeC/T 11.6 sI1.60 d2Robot Grid CubeStorageC/T 15.0 sI1.10 d3Carousel PortPut-to-LightC/T 20.6 sI0.70 d4Right-SizeAutomated BoxC/T 16.2 sI0.40 d5Sort Chute ParcelCarrierC/T 10.0 sI0.50 dCUSTOMERD2C OnlineCustomers4,200 / orders

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Bin Decanting & Barcode11.6 s15 min95%98.8%2,1005,040 (1.20 d)6,408
2. Robot Grid Cube Storage15.0 s10 min94%99.1%1,6806,720 (1.60 d)4,937
3. Carousel Port Put-to-Light20.6 s18 min89%96.9%1,2604,620 (1.10 d)3,240
4. Right-Size Automated Box16.2 s8 min93%98.4%8402,940 (0.70 d)4,440
5. Sort Chute Parcel Carrier10.0 s12 min97%99.5%1,6801,680 (0.40 d)7,644

Key figures

Takt time
19.3 s
Lead time
5.50 d
Value-added time
73.4 s
Process cycle efficiency (PCE)
0.016%
Rolled throughput yield (RTY)
92.9%
Customer demand per day
4,200 orders
Line capacity per day
3,240 orders
Bottleneck
Carousel Port Put-to-Light

Reading the bottleneck

The bottleneck is "Carousel Port Put-to-Light": it can process 3,240 orders per day against a demand of 4,200 orders, so it falls short of demand by 22.8%. Once downtime and scrap are counted, its cycle time grows from 20.6 s to 23.9 s, against a takt of 19.3 s. The largest loss at this step is equipment downtime (uptime 89%), about 2.5 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.