Two-Man Bulky Home Appliance Cross-Dock

Product family: Washers, Fridges & 75" TVs.

Flow: Appliance Import Hubs → Clamp-Truck Floor Unload → Visual Box Damage Scan → Zone Floor Bay Staging → Zip-Code Two-Man Pair Load → Scheduled Window Tail-Lift → Retail & Home Installers

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Two-Man Bulky Home Appliance Cross-DockSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Appliance Import Hubs → Clamp-Truck Floor Unload (43.0 s) → Visual Box Damage Scan (55.0 s) → Zone Floor Bay Staging (76.0 s) → Zip-Code Two-Man Pair Load (60.0 s) → Scheduled Window Tail-Lift (36.9 s) → Retail & Home Installers.SUPPLIERApplianceImport HubsI1.20 d1Clamp-Truck FloorUnloadC/T 43.0 sI1.60 d2Visual Box DamageScanC/T 55.0 sI1.10 d3Zone Floor BayStagingC/T 76.0 sI0.70 d4Zip-Code Two-ManPair LoadC/T 60.0 sI0.40 d5Scheduled WindowTail-LiftC/T 36.9 sI0.50 dCUSTOMERRetail & HomeInstallers380 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Clamp-Truck Floor Unload43.0 s15 min95%98.8%190456 (1.20 d)550
2. Visual Box Damage Scan55.0 s10 min94%99.1%152608 (1.60 d)432
3. Zone Floor Bay Staging76.0 s18 min89%96.9%114418 (1.10 d)266
4. Zip-Code Two-Man Pair Load60.0 s8 min93%98.4%76266 (0.70 d)375
5. Scheduled Window Tail-Lift36.9 s12 min97%99.5%152152 (0.40 d)659

Key figures

Takt time
71.1 s
Lead time
5.51 d
Value-added time
271 s
Process cycle efficiency (PCE)
0.18%
Rolled throughput yield (RTY)
92.9%
Customer demand per day
380 units
Line capacity per day
266 units
Bottleneck
Zone Floor Bay Staging

Reading the bottleneck

The bottleneck is "Zone Floor Bay Staging": it can process 266 units per day against a demand of 380 units, so it falls short of demand by 30.1%. Once downtime and scrap are counted, its cycle time grows from 76.0 s to 88.1 s, against a takt of 71.1 s. The largest loss at this step is changeovers (18 min every 114 units), about 9.5 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.