High-Security Consumer Tech Cage-to-Counter

Product family: IMEI Serialized Phone/PC Desk.

Flow: Armored Van Drops → Biometric Vault Intake Scan → Instant Floor Runner Request → Data Transfer & Trade-In Grade → IMEI Activation Receipt Match → Extended Warranty & Security Unlock → Walk-In & Trade-In Buyers

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: High-Security Consumer Tech Cage-to-CounterSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Armored Van Drops → Biometric Vault Intake Scan (62.0 s) → Instant Floor Runner Request (77.0 s) → Data Transfer & Trade-In Grade (103 s) → IMEI Activation Receipt Match (68.0 s) → Extended Warranty & Security Unlock (50.0 s) → Walk-In & Trade-In Buyers.SUPPLIERArmored VanDropsI1.40 d1Biometric VaultIntake ScanC/T 62.0 sI1.70 d2Instant FloorRunner RequestC/T 77.0 sI1.20 d3Data Transfer &Trade-In GradeC/T 103 sI0.60 d4IMEI ActivationReceipt MatchC/T 68.0 sI0.40 d5Extended Warranty& Security UnlockC/T 50.0 sI0.70 dCUSTOMERWalk-In &Trade-In Buyers280 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Biometric Vault Intake Scan62.0 s10 min95%98.6%140392 (1.40 d)390
2. Instant Floor Runner Request77.0 s8 min93%97.5%112476 (1.70 d)304
3. Data Transfer & Trade-In Grade103 s12 min88%94.0%56336 (1.20 d)188
4. IMEI Activation Receipt Match68.0 s5 min96%98.8%28168 (0.60 d)335
5. Extended Warranty & Security Unlock50.0 s3 min98%99.4%28112 (0.40 d)491

Key figures

Takt time
96.4 s
Lead time
6.01 d
Value-added time
360 s
Process cycle efficiency (PCE)
0.22%
Rolled throughput yield (RTY)
88.7%
Customer demand per day
280 units
Line capacity per day
188 units
Bottleneck
Data Transfer & Trade-In Grade

Reading the bottleneck

The bottleneck is "Data Transfer & Trade-In Grade": it can process 188 units per day against a demand of 280 units, so it falls short of demand by 32.9%. Once downtime and scrap are counted, its cycle time grows from 103 s to 125 s, against a takt of 96.4 s. The largest loss at this step is equipment downtime (uptime 88%), about 14.0 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.