Hypermarket Dawn Fresh Produce Mist & Display

Product family: Bulk Organic & Local Bins.

Flow: Regional Cold Produce Hub → 5AM Reefer Unload & Rot Check → Cold Trim, Mist & Crate Stack → Daytime FIFO Shelf Cull → Self-Weigh Scale Sticker Print → Night Shrink & Markdown Audit → Daily Supermarket Shoppers

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Hypermarket Dawn Fresh Produce Mist & DisplaySupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Regional Cold Produce Hub → 5AM Reefer Unload & Rot Check (6.2 s) → Cold Trim, Mist & Crate Stack (7.7 s) → Daytime FIFO Shelf Cull (10.3 s) → Self-Weigh Scale Sticker Print (6.7 s) → Night Shrink & Markdown Audit (5.0 s) → Daily Supermarket Shoppers.SUPPLIERRegional ColdProduce HubI1.40 d15AM Reefer Unload& Rot CheckC/T 6.2 sI1.70 d2Cold Trim, Mist &Crate StackC/T 7.7 sI1.20 d3Daytime FIFOShelf CullC/T 10.3 sI0.60 d4Self-Weigh ScaleSticker PrintC/T 6.7 sI0.40 d5Night Shrink &Markdown AuditC/T 5.0 sI0.70 dCUSTOMERDailySupermarket…2,800 / crates

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. 5AM Reefer Unload & Rot Check6.2 s10 min95%98.6%1,4003,920 (1.40 d)3,898
2. Cold Trim, Mist & Crate Stack7.7 s8 min93%97.5%1,1204,760 (1.70 d)3,038
3. Daytime FIFO Shelf Cull10.3 s12 min88%94.0%5603,360 (1.20 d)1,879
4. Self-Weigh Scale Sticker Print6.7 s5 min96%98.8%2801,680 (0.60 d)3,398
5. Night Shrink & Markdown Audit5.0 s3 min98%99.4%2801,120 (0.40 d)4,910

Key figures

Takt time
9.6 s
Lead time
6.00 d
Value-added time
35.9 s
Process cycle efficiency (PCE)
0.022%
Rolled throughput yield (RTY)
88.7%
Customer demand per day
2,800 crates
Line capacity per day
1,879 crates
Bottleneck
Daytime FIFO Shelf Cull

Reading the bottleneck

The bottleneck is "Daytime FIFO Shelf Cull": it can process 1,879 crates per day against a demand of 2,800 crates, so it falls short of demand by 32.9%. Once downtime and scrap are counted, its cycle time grows from 10.3 s to 12.5 s, against a takt of 9.6 s. The largest loss at this step is equipment downtime (uptime 88%), about 1.4 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Retail Stores, Omnichannel & QSR: Retail Stores, Omnichannel & QSR