Luxury Fashion Boutique Clienteling & Tailoring

Product family: Alteration & VIP Suite Flow.

Flow: Atelier Milan/Paris Drops → RFID Vault Reserve Retrieve → Private Styling Suite Prep → In-House Master Pin Alteration → Steam Press & Monogram Box → White-Glove Hotel Courier → VIP Appointment Shoppers

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Luxury Fashion Boutique Clienteling & TailoringSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Atelier Milan/Paris Drops → RFID Vault Reserve Retrieve (182 s) → Private Styling Suite Prep (227 s) → In-House Master Pin Alteration (304 s) → Steam Press & Monogram Box (199 s) → White-Glove Hotel Courier (148 s) → VIP Appointment Shoppers.SUPPLIERAtelierMilan/ParisDropsI1.40 d1RFID VaultReserve RetrieveC/T 182 sI1.71 d2Private StylingSuite PrepC/T 227 sI1.20 d3In-House MasterPin AlterationC/T 304 sI0.60 d4Steam Press &Monogram BoxC/T 199 sI0.40 d5White-Glove HotelCourierC/T 148 sI0.71 dCUSTOMERVIP AppointmentShoppers95 / orders

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. RFID Vault Reserve Retrieve182 s10 min95%98.6%48133 (1.40 d)133
2. Private Styling Suite Prep227 s8 min93%97.5%38162 (1.71 d)103
3. In-House Master Pin Alteration304 s12 min88%94.0%19114 (1.20 d)64
4. Steam Press & Monogram Box199 s5 min96%98.8%1057 (0.60 d)115
5. White-Glove Hotel Courier148 s3 min98%99.4%1038 (0.40 d)166

Key figures

Takt time
284 s
Lead time
6.05 d
Value-added time
1,060 s
Process cycle efficiency (PCE)
0.65%
Rolled throughput yield (RTY)
88.7%
Customer demand per day
95 orders
Line capacity per day
64 orders
Bottleneck
In-House Master Pin Alteration

Reading the bottleneck

The bottleneck is "In-House Master Pin Alteration": it can process 64 orders per day against a demand of 95 orders, so it falls short of demand by 33.0%. Once downtime and scrap are counted, its cycle time grows from 304 s to 368 s, against a takt of 284 s. The largest loss at this step is equipment downtime (uptime 88%), about 41.5 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.