DIY Home Center Drive-Thru Timber & Pallet Bay

Product family: Heavy Contractor Yard Flow.

Flow: Sawmill & Cement Suppliers → Overnight Yard Forklift Stock → Contractor App Pre-Pick Bay → Drive-Thru Van Roof Load → Barcode Forklift Yard Scan → License Plate Gate Checkout → Tradesmen & DIY Shoppers

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: DIY Home Center Drive-Thru Timber & Pallet BaySupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Sawmill & Cement Suppliers → Overnight Yard Forklift Stock (51.0 s) → Contractor App Pre-Pick Bay (64.0 s) → Drive-Thru Van Roof Load (85.0 s) → Barcode Forklift Yard Scan (56.0 s) → License Plate Gate Checkout (41.0 s) → Tradesmen & DIY Shoppers.SUPPLIERSawmill &CementSuppliersI1.40 d1Overnight YardForklift StockC/T 51.0 sI1.70 d2Contractor AppPre-Pick BayC/T 64.0 sI1.20 d3Drive-Thru VanRoof LoadC/T 85.0 sI0.60 d4Barcode ForkliftYard ScanC/T 56.0 sI0.40 d5License PlateGate CheckoutC/T 41.0 sI0.70 dCUSTOMERTradesmen & DIYShoppers340 / orders

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Overnight Yard Forklift Stock51.0 s10 min95%98.6%170476 (1.40 d)474
2. Contractor App Pre-Pick Bay64.0 s8 min93%97.5%136578 (1.70 d)366
3. Drive-Thru Van Roof Load85.0 s12 min88%94.0%68408 (1.20 d)228
4. Barcode Forklift Yard Scan56.0 s5 min96%98.8%34204 (0.60 d)406
5. License Plate Gate Checkout41.0 s3 min98%99.4%34136 (0.40 d)599

Key figures

Takt time
79.4 s
Lead time
6.01 d
Value-added time
297 s
Process cycle efficiency (PCE)
0.18%
Rolled throughput yield (RTY)
88.7%
Customer demand per day
340 orders
Line capacity per day
228 orders
Bottleneck
Drive-Thru Van Roof Load

Reading the bottleneck

The bottleneck is "Drive-Thru Van Roof Load": it can process 228 orders per day against a demand of 340 orders, so it falls short of demand by 33.0%. Once downtime and scrap are counted, its cycle time grows from 85.0 s to 103 s, against a takt of 79.4 s. The largest loss at this step is equipment downtime (uptime 88%), about 11.6 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Retail Stores, Omnichannel & QSR: Retail Stores, Omnichannel & QSR