Community Pharmacy Rx Dispense & OTC Shelf

Product family: Verified Prescription Flow.

Flow: Twice-Daily Pharma Tote → Tote Scan & Expiry FEFO → Robotic Pack Retrieval → Pharmacist Clinical Check → Dosage Label & Bag Consult → Insurance Co-Pay Checkout → Walk-In Patients

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Community Pharmacy Rx Dispense & OTC ShelfSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Twice-Daily Pharma Tote → Tote Scan & Expiry FEFO (41.0 s) → Robotic Pack Retrieval (51.0 s) → Pharmacist Clinical Check (69.0 s) → Dosage Label & Bag Consult (45.0 s) → Insurance Co-Pay Checkout (33.4 s) → Walk-In Patients.SUPPLIERTwice-DailyPharma ToteI1.40 d1Tote Scan &Expiry FEFOC/T 41.0 sI1.70 d2Robotic PackRetrievalC/T 51.0 sI1.20 d3PharmacistClinical CheckC/T 69.0 sI0.60 d4Dosage Label &Bag ConsultC/T 45.0 sI0.40 d5Insurance Co-PayCheckoutC/T 33.4 sI0.70 dCUSTOMERWalk-InPatients420 / orders

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Tote Scan & Expiry FEFO41.0 s10 min95%98.6%210588 (1.40 d)589
2. Robotic Pack Retrieval51.0 s8 min93%97.5%168714 (1.70 d)459
3. Pharmacist Clinical Check69.0 s12 min88%94.0%84504 (1.20 d)281
4. Dosage Label & Bag Consult45.0 s5 min96%98.8%42252 (0.60 d)506
5. Insurance Co-Pay Checkout33.4 s3 min98%99.4%42168 (0.40 d)735

Key figures

Takt time
64.3 s
Lead time
6.01 d
Value-added time
239 s
Process cycle efficiency (PCE)
0.15%
Rolled throughput yield (RTY)
88.7%
Customer demand per day
420 orders
Line capacity per day
281 orders
Bottleneck
Pharmacist Clinical Check

Reading the bottleneck

The bottleneck is "Pharmacist Clinical Check": it can process 281 orders per day against a demand of 420 orders, so it falls short of demand by 33.2%. Once downtime and scrap are counted, its cycle time grows from 69.0 s to 83.4 s, against a takt of 64.3 s. The largest loss at this step is equipment downtime (uptime 88%), about 9.4 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.