Production Database Deadlock & Query Tuning Fix

Product family: API P99 Latency SLA Restore.

Flow: APM Query Alerts → APM Trace Top-SQL Capture → Index Missing & Lock Analysis → Staging Explain-Analyze Verify → Online Concurrent Index Apply → P99 Latency Baseline Drop → Core Platform Squads

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Production Database Deadlock & Query Tuning FixSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. APM Query Alerts → APM Trace Top-SQL Capture (648 s) → Index Missing & Lock Analysis (960 s) → Staging Explain-Analyze Verify (1,284 s) → Online Concurrent Index Apply (864 s) → P99 Latency Baseline Drop (576 s) → Core Platform Squads.SUPPLIERAPM QueryAlertsI0.60 d1APM Trace Top-SQLCaptureC/T 648 sI1.40 d2Index Missing &Lock AnalysisC/T 960 sI2.20 d3StagingExplain-Analyze…C/T 1,284 sI0.91 d4Online ConcurrentIndex ApplyC/T 864 sI0.40 d5P99 LatencyBaseline DropC/T 576 sI0.40 dCUSTOMERCore PlatformSquads45 / tickets

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. APM Trace Top-SQL Capture648 s2 min98%91.5%527 (0.60 d)73
2. Index Missing & Lock Analysis960 s4 min94%93.0%963 (1.40 d)48
3. Staging Explain-Analyze Verify1,284 s10 min86%90.0%1499 (2.20 d)31
4. Online Concurrent Index Apply864 s6 min95%96.5%941 (0.91 d)55
5. P99 Latency Baseline Drop576 s2 min99%98.5%518 (0.40 d)90

Key figures

Takt time
1,200 s
Lead time
5.99 d
Value-added time
4,332 s
Process cycle efficiency (PCE)
1.3%
Rolled throughput yield (RTY)
72.8%
Customer demand per day
45 tickets
Line capacity per day
31 tickets
Bottleneck
Staging Explain-Analyze Verify

Reading the bottleneck

The bottleneck is "Staging Explain-Analyze Verify": it can process 31 tickets per day against a demand of 45 tickets, so it falls short of demand by 30.2%. Once downtime and scrap are counted, its cycle time grows from 1,284 s to 1,659 s, against a takt of 1,200 s. The largest loss at this step is equipment downtime (uptime 86%), about 209 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of ITSM Service Desk, SecOps & Cloud Ops: ITSM Service Desk, SecOps & Cloud Ops