Multi-Site Factory RF Wi-Fi 6E Outage Escalate
Product family: Zero-Deadzone AGV Roaming Fix.
Flow: AGV Telemetry & AP Alerts → AP Controller Drop Detection → Packet Capture Roaming Trace → Channel Co-Interference Tune → PoE Switch / AP Field Swap → AGV Roam Stress Verification → Automated Plant Floor Ops
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. AP Controller Drop Detection | 530 s | 2 min | 98% | 91.5% | 6 | 33 (0.60 d) | 90 |
| 2. Packet Capture Roaming Trace | 785 s | 4 min | 94% | 93.0% | 11 | 77 (1.40 d) | 59 |
| 3. Channel Co-Interference Tune | 1,051 s | 10 min | 86% | 90.0% | 17 | 121 (2.20 d) | 38 |
| 4. PoE Switch / AP Field Swap | 707 s | 6 min | 95% | 96.5% | 11 | 50 (0.91 d) | 68 |
| 5. AGV Roam Stress Verification | 471 s | 2 min | 99% | 98.5% | 6 | 22 (0.40 d) | 110 |
Key figures
- Takt time
- 982 s
- Lead time
- 5.97 d
- Value-added time
- 3,544 s
- Process cycle efficiency (PCE)
- 1.1%
- Rolled throughput yield (RTY)
- 72.8%
- Customer demand per day
- 55 tickets
- Line capacity per day
- 38 tickets
- Bottleneck
- Channel Co-Interference Tune
Reading the bottleneck
The bottleneck is "Channel Co-Interference Tune": it can process 38 tickets per day against a demand of 55 tickets, so it falls short of demand by 30.3%. Once downtime and scrap are counted, its cycle time grows from 1,051 s to 1,358 s, against a takt of 982 s. The largest loss at this step is equipment downtime (uptime 86%), about 171 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of ITSM Service Desk, SecOps & Cloud Ops: ITSM Service Desk, SecOps & Cloud Ops
- ITSM Incident & Change Resolution Desk
- 24/7 Managed Cyber SOC Tier-1/2 Alert Containment
- Weekly Cloud FinOps Right-Sizing & Spot Audit
- Zero-Trust Privileged Access Request & Review
- Zero-Touch Device / MDM Laptop Enrollment
- Enterprise Change Advisory Board (CAB) Pipeline
- Quarterly Multi-Region Disaster Recovery Drill
- Automated Shadow-IT & Unused SaaS License Purge
- Phishing Inbox Compromise Account Containment
- Production Database Deadlock & Query Tuning Fix
- Data Center Legacy Server Decommission & Wipe