Enterprise Change Advisory Board (CAB) Pipeline

Product family: Risk-Scored Production Changes.

Flow: Infrastructure & App Teams → RFC Impact & Rollback Check → Pre-Approved Low-Risk Auto → Weekly CAB Risk Arbitration → Maintenance Window Execute → Post-Implementation KPI Audit → Global Core Operations

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Enterprise Change Advisory Board (CAB) PipelineSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Infrastructure & App Teams → RFC Impact & Rollback Check (162 s) → Pre-Approved Low-Risk Auto (240 s) → Weekly CAB Risk Arbitration (321 s) → Maintenance Window Execute (216 s) → Post-Implementation KPI Audit (144 s) → Global Core Operations.SUPPLIERInfrastructure& App TeamsI0.60 d1RFC Impact &Rollback CheckC/T 162 sI1.40 d2Pre-ApprovedLow-Risk AutoC/T 240 sI2.20 d3Weekly CAB RiskArbitrationC/T 321 sI0.90 d4MaintenanceWindow ExecuteC/T 216 sI0.40 d5Post-ImplementationKPI AuditC/T 144 sI0.40 dCUSTOMERGlobal CoreOperations90 / tickets

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. RFC Impact & Rollback Check162 s2 min98%91.5%954 (0.60 d)143
2. Pre-Approved Low-Risk Auto240 s4 min94%93.0%18126 (1.40 d)94
3. Weekly CAB Risk Arbitration321 s10 min86%90.0%27198 (2.20 d)60
4. Maintenance Window Execute216 s6 min95%96.5%1881 (0.90 d)107
5. Post-Implementation KPI Audit144 s2 min99%98.5%936 (0.40 d)175

Key figures

Takt time
300 s
Lead time
5.94 d
Value-added time
1,083 s
Process cycle efficiency (PCE)
0.68%
Rolled throughput yield (RTY)
72.8%
Customer demand per day
90 tickets
Line capacity per day
60 tickets
Bottleneck
Weekly CAB Risk Arbitration

Reading the bottleneck

The bottleneck is "Weekly CAB Risk Arbitration": it can process 60 tickets per day against a demand of 90 tickets, so it falls short of demand by 33.0%. Once downtime and scrap are counted, its cycle time grows from 321 s to 415 s, against a takt of 300 s. The largest loss at this step is equipment downtime (uptime 86%), about 52.3 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.