Rare Archive Robotic Book Digitization & OCR

Product family: 600-DPI Archival PDF/A Flow.

Flow: Special Collection Vaults → Conservator Spine Angle Check → V-Cradle Dual-Camera Capture → Deskew, Crop & Multilingual OCR → MARC21 & IIIF Metadata Tag → Vault Return & Open Web Sync → Global Digital Researchers

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Rare Archive Robotic Book Digitization & OCRSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Special Collection Vaults → Conservator Spine Angle Check (72.0 s) → V-Cradle Dual-Camera Capture (86.0 s) → Deskew, Crop & Multilingual OCR (122 s) → MARC21 & IIIF Metadata Tag (79.0 s) → Vault Return & Open Web Sync (54.0 s) → Global Digital Researchers.SUPPLIERSpecialCollectionVaultsI1.40 d1Conservator SpineAngle CheckC/T 72.0 sI1.80 d2V-CradleDual-Camera…C/T 86.0 sI3.80 d3Deskew, Crop &Multilingual OCRC/T 122 sI0.90 d4MARC21 & IIIFMetadata TagC/T 79.0 sI0.40 d5Vault Return &Open Web SyncC/T 54.0 sI0.40 dCUSTOMERGlobal DigitalResearchers240 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Conservator Spine Angle Check72.0 s5 min96%91.5%60336 (1.40 d)315
2. V-Cradle Dual-Camera Capture86.0 s8 min94%93.8%60432 (1.80 d)257
3. Deskew, Crop & Multilingual OCR122 s15 min85%88.5%48912 (3.80 d)139
4. MARC21 & IIIF Metadata Tag79.0 s5 min96%97.6%36216 (0.90 d)297
5. Vault Return & Open Web Sync54.0 s2 min99%99.4%2496 (0.40 d)470

Key figures

Takt time
113 s
Lead time
8.72 d
Value-added time
413 s
Process cycle efficiency (PCE)
0.18%
Rolled throughput yield (RTY)
73.7%
Customer demand per day
240 units
Line capacity per day
139 units
Bottleneck
Deskew, Crop & Multilingual OCR

Reading the bottleneck

The bottleneck is "Deskew, Crop & Multilingual OCR": it can process 139 units per day against a demand of 240 units, so it falls short of demand by 42.2%. Once downtime and scrap are counted, its cycle time grows from 122 s to 162 s, against a takt of 113 s. The largest loss at this step is equipment downtime (uptime 85%), about 21.5 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Higher Education, Research & Publishing: Higher Education, Research & Publishing