University Undergraduate Admission Decision Loop

Product family: 30,000-Applicant Merit Review.

Flow: High-School Grade Registries → Transcript & Test Auto-Ingest → Credential Equivalency Eval → Holistic Faculty/Reader Score → Scholarship Aid Optimization → Portal Offer & Deposit Lock → Prospective Freshmen

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: University Undergraduate Admission Decision LoopSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. High-School Grade Registries → Transcript & Test Auto-Ingest (41.0 s) → Credential Equivalency Eval (49.0 s) → Holistic Faculty/Reader Score (69.0 s) → Scholarship Aid Optimization (45.0 s) → Portal Offer & Deposit Lock (30.9 s) → Prospective Freshmen.SUPPLIERHigh-SchoolGradeRegistriesI1.40 d1Transcript & TestAuto-IngestC/T 41.0 sI1.80 d2CredentialEquivalency EvalC/T 49.0 sI3.80 d3HolisticFaculty/Reader…C/T 69.0 sI0.90 d4Scholarship AidOptimizationC/T 45.0 sI0.40 d5Portal Offer &Deposit LockC/T 30.9 sI0.40 dCUSTOMERProspectiveFreshmen420 / files

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Transcript & Test Auto-Ingest41.0 s5 min96%91.5%105588 (1.40 d)553
2. Credential Equivalency Eval49.0 s8 min94%93.8%105756 (1.80 d)451
3. Holistic Faculty/Reader Score69.0 s15 min85%88.5%841,596 (3.80 d)245
4. Scholarship Aid Optimization45.0 s5 min96%97.6%63378 (0.90 d)521
5. Portal Offer & Deposit Lock30.9 s2 min99%99.4%42168 (0.40 d)822

Key figures

Takt time
64.3 s
Lead time
8.71 d
Value-added time
235 s
Process cycle efficiency (PCE)
0.100%
Rolled throughput yield (RTY)
73.7%
Customer demand per day
420 files
Line capacity per day
245 files
Bottleneck
Holistic Faculty/Reader Score

Reading the bottleneck

The bottleneck is "Holistic Faculty/Reader Score": it can process 245 files per day against a demand of 420 files, so it falls short of demand by 41.6%. Once downtime and scrap are counted, its cycle time grows from 69.0 s to 91.7 s, against a takt of 64.3 s. The largest loss at this step is equipment downtime (uptime 85%), about 12.2 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Higher Education, Research & Publishing: Higher Education, Research & Publishing