Land-Border Truck e-TIR Green-Lane Crossing

Product family: Zero-Stop Pre-Cleared Freight.

Flow: Forwarder Pre-Declarations → 2-Hr Pre-Arrival e-TIR Risk → ANPR Plate & Radiation Gate → Selectivity Lane Green/Red → Physical Bay / Scanner Inspect → Exit Barrier & Transit Close → Cross-Border Hauliers

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Land-Border Truck e-TIR Green-Lane CrossingSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Forwarder Pre-Declarations → 2-Hr Pre-Arrival e-TIR Risk (120 s) → ANPR Plate & Radiation Gate (150 s) → Selectivity Lane Green/Red (206 s) → Physical Bay / Scanner Inspect (131 s) → Exit Barrier & Transit Close (93.0 s) → Cross-Border Hauliers.SUPPLIERForwarderPre-DeclarationsI1.40 d12-Hr Pre-Arrivale-TIR RiskC/T 120 sI1.80 d2ANPR Plate &Radiation GateC/T 150 sI3.40 d3Selectivity LaneGreen/RedC/T 206 sI0.90 d4Physical Bay /Scanner InspectC/T 131 sI0.40 d5Exit Barrier &Transit CloseC/T 93.0 sI0.40 dCUSTOMERCross-BorderHauliers420 / TEU

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. 2-Hr Pre-Arrival e-TIR Risk120 s5 min97%89.5%84588 (1.40 d)575
2. ANPR Plate & Radiation Gate150 s6 min94%92.5%84756 (1.80 d)459
3. Selectivity Lane Green/Red206 s12 min86%89.0%1051,428 (3.40 d)290
4. Physical Bay / Scanner Inspect131 s4 min96%97.6%42378 (0.90 d)562
5. Exit Barrier & Transit Close93.0 s2 min99%99.2%42168 (0.40 d)843

Key figures

Takt time
193 s
Lead time
8.31 d
Value-added time
700 s
Process cycle efficiency (PCE)
0.10%
Rolled throughput yield (RTY)
71.3%
Customer demand per day
420 TEU
Line capacity per day
290 TEU
Bottleneck
Selectivity Lane Green/Red

Reading the bottleneck

The bottleneck is "Selectivity Lane Green/Red": it can process 290 TEU per day against a demand of 420 TEU, so it falls short of demand by 30.9%. Once downtime and scrap are counted, its cycle time grows from 206 s to 269 s, against a takt of 193 s. The largest loss at this step is equipment downtime (uptime 86%), about 33.5 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.