Blockchain-Anchored Real Estate Deed Transfer Desk

Product family: 48-Hr Parcel Ownership Title.

Flow: Licensed Notaries & Surveyors → Notary XML & Stamp Duty Paid → Surveyor GIS Boundary Match → Registrar Encumbrance Hold → Title Ledger Atomic Update → QR Digital Ownership Extract → Property Owners & Mortgagees

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Blockchain-Anchored Real Estate Deed Transfer DeskSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Licensed Notaries & Surveyors → Notary XML & Stamp Duty Paid (105 s) → Surveyor GIS Boundary Match (132 s) → Registrar Encumbrance Hold (181 s) → Title Ledger Atomic Update (115 s) → QR Digital Ownership Extract (81.0 s) → Property Owners & Mortgagees.SUPPLIERLicensedNotaries &SurveyorsI1.40 d1Notary XML &Stamp Duty PaidC/T 105 sI1.80 d2Surveyor GISBoundary MatchC/T 132 sI3.40 d3RegistrarEncumbrance HoldC/T 181 sI0.90 d4Title LedgerAtomic UpdateC/T 115 sI0.40 d5QR DigitalOwnership ExtractC/T 81.0 sI0.40 dCUSTOMERProperty Owners& Mortgagees160 / files

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Notary XML & Stamp Duty Paid105 s5 min97%89.5%32224 (1.40 d)211
2. Surveyor GIS Boundary Match132 s6 min94%92.5%32288 (1.80 d)166
3. Registrar Encumbrance Hold181 s12 min86%89.0%40544 (3.40 d)102
4. Title Ledger Atomic Update115 s4 min96%97.6%16144 (0.90 d)200
5. QR Digital Ownership Extract81.0 s2 min99%99.2%1664 (0.40 d)313

Key figures

Takt time
169 s
Lead time
8.32 d
Value-added time
614 s
Process cycle efficiency (PCE)
0.27%
Rolled throughput yield (RTY)
71.3%
Customer demand per day
160 files
Line capacity per day
102 files
Bottleneck
Registrar Encumbrance Hold

Reading the bottleneck

The bottleneck is "Registrar Encumbrance Hold": it can process 102 files per day against a demand of 160 files, so it falls short of demand by 36.3%. Once downtime and scrap are counted, its cycle time grows from 181 s to 236 s, against a takt of 169 s. The largest loss at this step is equipment downtime (uptime 86%), about 29.5 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.