Commercial Venue Fire-Marshal Safety Inspection

Product family: Annual Occupancy Cert Cycle.

Flow: Malls, Hotels & Nightclubs → Self-Cert Alarm Test Upload → Inspector On-Site Exit Walk → Deficiency 14-Day Re-Check → QR Capacity Placard Approve → Portal Public Registry Live → City Safety Permitting

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Commercial Venue Fire-Marshal Safety InspectionSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Malls, Hotels & Nightclubs → Self-Cert Alarm Test Upload (399 s) → Inspector On-Site Exit Walk (501 s) → Deficiency 14-Day Re-Check (688 s) → QR Capacity Placard Approve (437 s) → Portal Public Registry Live (309 s) → City Safety Permitting.SUPPLIERMalls, Hotels &NightclubsI1.40 d1Self-Cert AlarmTest UploadC/T 399 sI1.81 d2Inspector On-SiteExit WalkC/T 501 sI3.40 d3Deficiency 14-DayRe-CheckC/T 688 sI0.90 d4QR CapacityPlacard ApproveC/T 437 sI0.40 d5Portal PublicRegistry LiveC/T 309 sI0.40 dCUSTOMERCity SafetyPermitting42 / cases

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Self-Cert Alarm Test Upload399 s5 min97%89.5%859 (1.40 d)55
2. Inspector On-Site Exit Walk501 s6 min94%92.5%876 (1.81 d)44
3. Deficiency 14-Day Re-Check688 s12 min86%89.0%11143 (3.40 d)27
4. QR Capacity Placard Approve437 s4 min96%97.6%438 (0.90 d)52
5. Portal Public Registry Live309 s2 min99%99.2%417 (0.40 d)82

Key figures

Takt time
643 s
Lead time
8.42 d
Value-added time
2,334 s
Process cycle efficiency (PCE)
1.0%
Rolled throughput yield (RTY)
71.3%
Customer demand per day
42 cases
Line capacity per day
27 cases
Bottleneck
Deficiency 14-Day Re-Check

Reading the bottleneck

The bottleneck is "Deficiency 14-Day Re-Check": it can process 27 cases per day against a demand of 42 cases, so it falls short of demand by 35.8%. Once downtime and scrap are counted, its cycle time grows from 688 s to 899 s, against a takt of 643 s. The largest loss at this step is equipment downtime (uptime 86%), about 112 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Public Services, Gov Permits & Registries: Public Services, Gov Permits & Registries