Municipal Restaurant Hygiene Rating Inspection

Product family: Risk-Based Health Scores.

Flow: Urban Restaurants & Markets → Risk-Interval Unannounced Visit → Cold-Chain Temp & Pest Audit → Supervisor Re-Grade Critical → Digital Window Grade Sticker → Open-Data Hygiene Map Sync → Public Transparency Portal

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Municipal Restaurant Hygiene Rating InspectionSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Urban Restaurants & Markets → Risk-Interval Unannounced Visit (197 s) → Cold-Chain Temp & Pest Audit (248 s) → Supervisor Re-Grade Critical (340 s) → Digital Window Grade Sticker (216 s) → Open-Data Hygiene Map Sync (152 s) → Public Transparency Portal.SUPPLIERUrbanRestaurants &MarketsI1.40 d1Risk-IntervalUnannounced VisitC/T 197 sI1.80 d2Cold-Chain Temp &Pest AuditC/T 248 sI3.40 d3SupervisorRe-Grade CriticalC/T 340 sI0.91 d4Digital WindowGrade StickerC/T 216 sI0.40 d5Open-Data HygieneMap SyncC/T 152 sI0.40 dCUSTOMERPublicTransparency…85 / cases

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Risk-Interval Unannounced Visit197 s5 min97%89.5%17119 (1.40 d)112
2. Cold-Chain Temp & Pest Audit248 s6 min94%92.5%17153 (1.80 d)88
3. Supervisor Re-Grade Critical340 s12 min86%89.0%21289 (3.40 d)54
4. Digital Window Grade Sticker216 s4 min96%97.6%977 (0.91 d)107
5. Open-Data Hygiene Map Sync152 s2 min99%99.2%934 (0.40 d)167

Key figures

Takt time
318 s
Lead time
8.35 d
Value-added time
1,153 s
Process cycle efficiency (PCE)
0.51%
Rolled throughput yield (RTY)
71.3%
Customer demand per day
85 cases
Line capacity per day
54 cases
Bottleneck
Supervisor Re-Grade Critical

Reading the bottleneck

The bottleneck is "Supervisor Re-Grade Critical": it can process 54 cases per day against a demand of 85 cases, so it falls short of demand by 36.2%. Once downtime and scrap are counted, its cycle time grows from 340 s to 444 s, against a takt of 318 s. The largest loss at this step is equipment downtime (uptime 86%), about 55.3 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.