Biometric e-Passport Renewal & Security Print Flow

Product family: Chip-Encoded National Passports.

Flow: Digital Citizen Self-Portal → Online Bio-Photo Liveness QC → Police Watchlist Check → Examiner Manual Identity Aud → Polycarbonate Laser Engrave → RFID Chip Test & Courier Bag → Citizens & Consulates

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Biometric e-Passport Renewal & Security Print FlowSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Digital Citizen Self-Portal → Online Bio-Photo Liveness QC (12.0 s) → Police Watchlist Check (15.0 s) → Examiner Manual Identity Aud (20.6 s) → Polycarbonate Laser Engrave (13.1 s) → RFID Chip Test & Courier Bag (9.3 s) → Citizens & Consulates.SUPPLIERDigital CitizenSelf-PortalI1.40 d1Online Bio-PhotoLiveness QCC/T 12.0 sI1.80 d2Police WatchlistCheckC/T 15.0 sI3.40 d3Examiner ManualIdentity AudC/T 20.6 sI0.90 d4PolycarbonateLaser EngraveC/T 13.1 sI0.40 d5RFID Chip Test &Courier BagC/T 9.3 sI0.40 dCUSTOMERCitizens &Consulates1,400 / files

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Online Bio-Photo Liveness QC12.0 s5 min97%89.5%2801,960 (1.40 d)1,845
2. Police Watchlist Check15.0 s6 min94%92.5%2802,520 (1.80 d)1,461
3. Examiner Manual Identity Aud20.6 s12 min86%89.0%3504,760 (3.40 d)896
4. Polycarbonate Laser Engrave13.1 s4 min96%97.6%1401,260 (0.90 d)1,759
5. RFID Chip Test & Courier Bag9.3 s2 min99%99.2%140560 (0.40 d)2,724

Key figures

Takt time
19.3 s
Lead time
8.30 d
Value-added time
70.0 s
Process cycle efficiency (PCE)
0.031%
Rolled throughput yield (RTY)
71.3%
Customer demand per day
1,400 files
Line capacity per day
896 files
Bottleneck
Examiner Manual Identity Aud

Reading the bottleneck

The bottleneck is "Examiner Manual Identity Aud": it can process 896 files per day against a demand of 1,400 files, so it falls short of demand by 36.0%. Once downtime and scrap are counted, its cycle time grows from 20.6 s to 26.9 s, against a takt of 19.3 s. The largest loss at this step is equipment downtime (uptime 86%), about 3.4 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.