Automated Multi-Lane Vehicle Roadworthiness Test

Product family: 12-Min Emissions & Brake Pass.

Flow: Private & Taxi Vehicle Fleet → ANPR Plate Check & Fee Scan → OBD-II & Opacity Exhaust Test → Roller Brake & Suspension Rig → Under-Chassis Play & Lights → Windshield Sticker & Digital Cert → Vehicle Owners

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Automated Multi-Lane Vehicle Roadworthiness TestSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Private & Taxi Vehicle Fleet → ANPR Plate Check & Fee Scan (44.0 s) → OBD-II & Opacity Exhaust Test (55.0 s) → Roller Brake & Suspension Rig (76.0 s) → Under-Chassis Play & Lights (48.0 s) → Windshield Sticker & Digital Cert (34.1 s) → Vehicle Owners.SUPPLIERPrivate & TaxiVehicle FleetI1.40 d1ANPR Plate Check& Fee ScanC/T 44.0 sI1.80 d2OBD-II & OpacityExhaust TestC/T 55.0 sI3.40 d3Roller Brake &Suspension RigC/T 76.0 sI0.90 d4Under-ChassisPlay & LightsC/T 48.0 sI0.40 d5WindshieldSticker & Digita…C/T 34.1 sI0.40 dCUSTOMERVehicle Owners380 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. ANPR Plate Check & Fee Scan44.0 s5 min97%89.5%76532 (1.40 d)503
2. OBD-II & Opacity Exhaust Test55.0 s6 min94%92.5%76684 (1.80 d)398
3. Roller Brake & Suspension Rig76.0 s12 min86%89.0%951,292 (3.40 d)243
4. Under-Chassis Play & Lights48.0 s4 min96%97.6%38342 (0.90 d)480
5. Windshield Sticker & Digital Cert34.1 s2 min99%99.2%38152 (0.40 d)743

Key figures

Takt time
71.1 s
Lead time
8.31 d
Value-added time
257 s
Process cycle efficiency (PCE)
0.11%
Rolled throughput yield (RTY)
71.3%
Customer demand per day
380 units
Line capacity per day
243 units
Bottleneck
Roller Brake & Suspension Rig

Reading the bottleneck

The bottleneck is "Roller Brake & Suspension Rig": it can process 243 units per day against a demand of 380 units, so it falls short of demand by 36.1%. Once downtime and scrap are counted, its cycle time grows from 76.0 s to 99.3 s, against a takt of 71.1 s. The largest loss at this step is equipment downtime (uptime 86%), about 12.4 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.