Digital Driver’s License Theory, Road Test & Card

Product family: End-to-End Licensing Flow.

Flow: Driving Schools & Medical → Medical & Theory Exam Clear → Examiner Road Test Tablet Grade → Registry Fraud Hold Verification → UV Card Laser Print & Encode → Tracked Post Card Mail Out → New Licensed Drivers

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Digital Driver’s License Theory, Road Test & CardSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Driving Schools & Medical → Medical & Theory Exam Clear (34.9 s) → Examiner Road Test Tablet Grade (44.0 s) → Registry Fraud Hold Verification (60.0 s) → UV Card Laser Print & Encode (38.3 s) → Tracked Post Card Mail Out (27.0 s) → New Licensed Drivers.SUPPLIERDriving Schools& MedicalI1.40 d1Medical & TheoryExam ClearC/T 34.9 sI1.80 d2Examiner RoadTest Tablet GradeC/T 44.0 sI3.40 d3Registry FraudHold VerificationC/T 60.0 sI0.90 d4UV Card LaserPrint & EncodeC/T 38.3 sI0.40 d5Tracked Post CardMail OutC/T 27.0 sI0.40 dCUSTOMERNew LicensedDrivers480 / files

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Medical & Theory Exam Clear34.9 s5 min97%89.5%96672 (1.40 d)634
2. Examiner Road Test Tablet Grade44.0 s6 min94%92.5%96864 (1.80 d)498
3. Registry Fraud Hold Verification60.0 s12 min86%89.0%1201,632 (3.40 d)308
4. UV Card Laser Print & Encode38.3 s4 min96%97.6%48432 (0.90 d)602
5. Tracked Post Card Mail Out27.0 s2 min99%99.2%48192 (0.40 d)938

Key figures

Takt time
56.3 s
Lead time
8.31 d
Value-added time
204 s
Process cycle efficiency (PCE)
0.091%
Rolled throughput yield (RTY)
71.3%
Customer demand per day
480 files
Line capacity per day
308 files
Bottleneck
Registry Fraud Hold Verification

Reading the bottleneck

The bottleneck is "Registry Fraud Hold Verification": it can process 308 files per day against a demand of 480 files, so it falls short of demand by 35.9%. Once downtime and scrap are counted, its cycle time grows from 60.0 s to 78.4 s, against a takt of 56.3 s. The largest loss at this step is equipment downtime (uptime 86%), about 9.8 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.