Laparoscopic Sleeve Gastrectomy Clinical Track

Product family: 48-Hr Metabolic Surgery.

Flow: Stapler Reload Carts → Liquid Diet & Anesthesia Clear → 4-Port Trocar Prep Bay → Laparoscopic Sleeve & Leak → Early Ambulation & Sips → Dietitian Discharge App → Metabolic Health Patients

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Laparoscopic Sleeve Gastrectomy Clinical TrackSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Stapler Reload Carts → Liquid Diet & Anesthesia Clear (1,563 s) → 4-Port Trocar Prep Bay (2,052 s) → Laparoscopic Sleeve & Leak (2,614 s) → Early Ambulation & Sips (1,905 s) → Dietitian Discharge App (1,173 s) → Metabolic Health Patients.SUPPLIERStapler ReloadCartsI0.57 d1Liquid Diet &Anesthesia ClearC/T 1,563 sI0.50 d24-Port TrocarPrep BayC/T 2,052 sI0.79 d3LaparoscopicSleeve & LeakC/T 2,614 sI0.43 d4Early Ambulation& SipsC/T 1,905 sI0.29 d5DietitianDischarge AppC/T 1,173 sI0.29 dCUSTOMERMetabolicHealth Patients14 / patients

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Liquid Diet & Anesthesia Clear1,563 s5 min97%96.5%38 (0.57 d)20
2. 4-Port Trocar Prep Bay2,052 s10 min94%95.8%37 (0.50 d)14
3. Laparoscopic Sleeve & Leak2,614 s28 min84%94.0%211 (0.79 d)7
4. Early Ambulation & Sips1,905 s6 min95%98.2%16 (0.43 d)17
5. Dietitian Discharge App1,173 s4 min98%97.5%14 (0.29 d)28

Key figures

Takt time
2,443 s
Lead time
3.13 d
Value-added time
9,307 s
Process cycle efficiency (PCE)
8.7%
Rolled throughput yield (RTY)
83.2%
Customer demand per day
14 patients
Line capacity per day
7 patients
Bottleneck
Laparoscopic Sleeve & Leak

Reading the bottleneck

The bottleneck is "Laparoscopic Sleeve & Leak": it can process 7 patients per day against a demand of 14 patients, so it falls short of demand by 51.6%. Once downtime and scrap are counted, its cycle time grows from 2,614 s to 3,311 s, against a takt of 2,443 s. The largest loss at this step is changeovers (28 min every 2 units), about 840 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Surgery, Inpatient & Outpatient Care: Surgery, Inpatient & Outpatient Care