3-Shift Outpatient Hemodialysis Chair Cycle
Product family: 4-Hour Chronic Renal Loop.
Flow: Dialyzers & Acid Concentrate → Pre-Weight & Access Wash → Machine Prime & AV Fistula → 4-Hr Hemodialysis Session → Hemostasis & Post-Weight → 15-Min Acid Clean Chair Turn → ESRD Chronic Patients
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Pre-Weight & Access Wash | 365 s | 5 min | 97% | 96.5% | 24 | 72 (0.60 d) | 172 |
| 2. Machine Prime & AV Fistula | 479 s | 10 min | 94% | 95.8% | 24 | 60 (0.50 d) | 123 |
| 3. 4-Hr Hemodialysis Session | 610 s | 28 min | 84% | 94.0% | 18 | 96 (0.80 d) | 74 |
| 4. Hemostasis & Post-Weight | 445 s | 6 min | 95% | 98.2% | 12 | 48 (0.40 d) | 136 |
| 5. 15-Min Acid Clean Chair Turn | 274 s | 4 min | 98% | 97.5% | 12 | 36 (0.30 d) | 230 |
Key figures
- Takt time
- 570 s
- Lead time
- 2.88 d
- Value-added time
- 2,173 s
- Process cycle efficiency (PCE)
- 1.1%
- Rolled throughput yield (RTY)
- 83.2%
- Customer demand per day
- 120 patients
- Line capacity per day
- 74 patients
- Bottleneck
- 4-Hr Hemodialysis Session
Reading the bottleneck
The bottleneck is "4-Hr Hemodialysis Session": it can process 74 patients per day against a demand of 120 patients, so it falls short of demand by 38.3%. Once downtime and scrap are counted, its cycle time grows from 610 s to 773 s, against a takt of 570 s. The largest loss at this step is equipment downtime (uptime 84%), about 116 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Surgery, Inpatient & Outpatient Care: Surgery, Inpatient & Outpatient Care
- Outpatient Surgery Clinical Pathway
- High-Volume Ophthalmic Cataract Day Clinic
- Enhanced-Recovery (ERAS) Total Knee Arthroplasty
- Interventional Cardiology Elective PCI Stent Lab
- Screening Colonoscopy & GI Endoscopy Loop
- Digital Guided All-on-4 Dental Implant Day
- Outpatient Oncology Chemotherapy Chair Flow
- Maternity Labor, Delivery & Postpartum Suite
- Post-Surgical ICU-to-General-Ward Transfer Flow
- Laparoscopic Sleeve Gastrectomy Clinical Track
- Fluoroscopy-Guided Spine Pain Injection Clinic