Post-Surgical ICU-to-General-Ward Transfer Flow
Product family: Critical Care Bed Unblock.
Flow: Transport & Telemetry Crew → Intensivist Step-Down Clear → Receiving Ward Nurse Report → Bed Clean & Telemetry Prep → Safe ICU Porter Hand-Off → Ward Med Reconciliation → Medical-Surgical Wards
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Intensivist Step-Down Clear | 3,283 s | 5 min | 97% | 96.5% | 4 | 12 (0.60 d) | 29 |
| 2. Receiving Ward Nurse Report | 4,309 s | 10 min | 94% | 95.8% | 4 | 10 (0.50 d) | 21 |
| 3. Bed Clean & Telemetry Prep | 5,489 s | 28 min | 84% | 94.0% | 3 | 16 (0.80 d) | 13 |
| 4. Safe ICU Porter Hand-Off | 4,001 s | 6 min | 95% | 98.2% | 2 | 8 (0.40 d) | 23 |
| 5. Ward Med Reconciliation | 2,462 s | 4 min | 98% | 97.5% | 2 | 6 (0.30 d) | 39 |
Key figures
- Takt time
- 5,130 s
- Lead time
- 3.04 d
- Value-added time
- 19,544 s
- Process cycle efficiency (PCE)
- 6.3%
- Rolled throughput yield (RTY)
- 83.2%
- Customer demand per day
- 20 patients
- Line capacity per day
- 13 patients
- Bottleneck
- Bed Clean & Telemetry Prep
Reading the bottleneck
The bottleneck is "Bed Clean & Telemetry Prep": it can process 13 patients per day against a demand of 20 patients, so it falls short of demand by 34.3%. Once downtime and scrap are counted, its cycle time grows from 5,489 s to 6,952 s, against a takt of 5,130 s. The largest loss at this step is equipment downtime (uptime 84%), about 1,046 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Surgery, Inpatient & Outpatient Care: Surgery, Inpatient & Outpatient Care
- Outpatient Surgery Clinical Pathway
- High-Volume Ophthalmic Cataract Day Clinic
- Enhanced-Recovery (ERAS) Total Knee Arthroplasty
- Interventional Cardiology Elective PCI Stent Lab
- Screening Colonoscopy & GI Endoscopy Loop
- Digital Guided All-on-4 Dental Implant Day
- 3-Shift Outpatient Hemodialysis Chair Cycle
- Outpatient Oncology Chemotherapy Chair Flow
- Maternity Labor, Delivery & Postpartum Suite
- Laparoscopic Sleeve Gastrectomy Clinical Track
- Fluoroscopy-Guided Spine Pain Injection Clinic