Digital Guided All-on-4 Dental Implant Day
Product family: Same-Day 3D-Printed Smile.
Flow: Implant Maker & 3D Lab → CBCT Scan & Digital Smile → Local/IV Anesthesia Prep → Guided Titanium Implant Place → Chairside 3D Crown Milling → Occlusion Bite & Care Exit → Private Prosthodontic Care
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. CBCT Scan & Digital Smile | 995 s | 5 min | 97% | 96.5% | 4 | 13 (0.59 d) | 31 |
| 2. Local/IV Anesthesia Prep | 1,306 s | 10 min | 94% | 95.8% | 4 | 11 (0.50 d) | 21 |
| 3. Guided Titanium Implant Place | 1,663 s | 28 min | 84% | 94.0% | 3 | 18 (0.82 d) | 10 |
| 4. Chairside 3D Crown Milling | 1,213 s | 6 min | 95% | 98.2% | 2 | 9 (0.41 d) | 23 |
| 5. Occlusion Bite & Care Exit | 746 s | 4 min | 98% | 97.5% | 2 | 7 (0.32 d) | 40 |
Key figures
- Takt time
- 1,555 s
- Lead time
- 3.08 d
- Value-added time
- 5,923 s
- Process cycle efficiency (PCE)
- 5.6%
- Rolled throughput yield (RTY)
- 83.2%
- Customer demand per day
- 22 patients
- Line capacity per day
- 10 patients
- Bottleneck
- Guided Titanium Implant Place
Reading the bottleneck
The bottleneck is "Guided Titanium Implant Place": it can process 10 patients per day against a demand of 22 patients, so it falls short of demand by 52.8%. Once downtime and scrap are counted, its cycle time grows from 1,663 s to 2,106 s, against a takt of 1,555 s. The largest loss at this step is changeovers (28 min every 3 units), about 560 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Surgery, Inpatient & Outpatient Care: Surgery, Inpatient & Outpatient Care
- Outpatient Surgery Clinical Pathway
- High-Volume Ophthalmic Cataract Day Clinic
- Enhanced-Recovery (ERAS) Total Knee Arthroplasty
- Interventional Cardiology Elective PCI Stent Lab
- Screening Colonoscopy & GI Endoscopy Loop
- 3-Shift Outpatient Hemodialysis Chair Cycle
- Outpatient Oncology Chemotherapy Chair Flow
- Maternity Labor, Delivery & Postpartum Suite
- Post-Surgical ICU-to-General-Ward Transfer Flow
- Laparoscopic Sleeve Gastrectomy Clinical Track
- Fluoroscopy-Guided Spine Pain Injection Clinic