Enhanced-Recovery (ERAS) Total Knee Arthroplasty

Product family: Fast-Track Joint Replacement.

Flow: Robot-Guided Knee Implants → Pre-Habilitation & Spinal Block → Robot-Guided Knee Implant → Day-0 PT Mobilization → Acute Pain Oral Switch → Home Physio Discharge → Inpatient Ortho Ward

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Enhanced-Recovery (ERAS) Total Knee ArthroplastySupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Robot-Guided Knee Implants → Pre-Habilitation & Spinal Block (1,216 s) → Robot-Guided Knee Implant (1,596 s) → Day-0 PT Mobilization (2,033 s) → Acute Pain Oral Switch (1,482 s) → Home Physio Discharge (912 s) → Inpatient Ortho Ward.SUPPLIERRobot-GuidedKnee ImplantsI0.61 d1Pre-Habilitation& Spinal BlockC/T 1,216 sI0.50 d2Robot-Guided KneeImplantC/T 1,596 sI0.78 d3Day-0 PTMobilizationC/T 2,033 sI0.39 d4Acute Pain OralSwitchC/T 1,482 sI0.28 d5Home PhysioDischargeC/T 912 sI0.28 dCUSTOMERInpatient OrthoWard18 / patients

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Pre-Habilitation & Spinal Block1,216 s5 min97%96.5%411 (0.61 d)25
2. Robot-Guided Knee Implant1,596 s10 min94%95.8%49 (0.50 d)18
3. Day-0 PT Mobilization2,033 s28 min84%94.0%314 (0.78 d)9
4. Acute Pain Oral Switch1,482 s6 min95%98.2%27 (0.39 d)19
5. Home Physio Discharge912 s4 min98%97.5%25 (0.28 d)34

Key figures

Takt time
1,900 s
Lead time
3.04 d
Value-added time
7,239 s
Process cycle efficiency (PCE)
7.0%
Rolled throughput yield (RTY)
83.2%
Customer demand per day
18 patients
Line capacity per day
9 patients
Bottleneck
Day-0 PT Mobilization

Reading the bottleneck

The bottleneck is "Day-0 PT Mobilization": it can process 9 patients per day against a demand of 18 patients, so it falls short of demand by 48.0%. Once downtime and scrap are counted, its cycle time grows from 2,033 s to 2,575 s, against a takt of 1,900 s. The largest loss at this step is changeovers (28 min every 3 units), about 560 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.