Interventional Cardiology Elective PCI Stent Lab

Product family: Radial Coronary Angiograms.

Flow: Stent Consignment → Radial Check & Consent → Fluoroscopy Table Prep → Coronary Stent Deployment → Radial Compression Lounge → Same-Evening Safe Home → Cardiac Short-Stay

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Interventional Cardiology Elective PCI Stent LabSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Stent Consignment → Radial Check & Consent (782 s) → Fluoroscopy Table Prep (1,026 s) → Coronary Stent Deployment (1,307 s) → Radial Compression Lounge (953 s) → Same-Evening Safe Home (586 s) → Cardiac Short-Stay.SUPPLIERStentConsignmentI0.61 d1Radial Check &ConsentC/T 782 sI0.50 d2Fluoroscopy TablePrepC/T 1,026 sI0.79 d3Coronary StentDeploymentC/T 1,307 sI0.39 d4RadialCompression…C/T 953 sI0.29 d5Same-Evening SafeHomeC/T 586 sI0.25 dCUSTOMERCardiacShort-Stay28 / patients

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Radial Check & Consent782 s5 min97%96.5%617 (0.61 d)39
2. Fluoroscopy Table Prep1,026 s10 min94%95.8%614 (0.50 d)28
3. Coronary Stent Deployment1,307 s28 min84%94.0%422 (0.79 d)14
4. Radial Compression Lounge953 s6 min95%98.2%311 (0.39 d)30
5. Same-Evening Safe Home586 s4 min98%97.5%38 (0.29 d)52

Key figures

Takt time
1,221 s
Lead time
2.96 d
Value-added time
4,654 s
Process cycle efficiency (PCE)
4.6%
Rolled throughput yield (RTY)
83.2%
Customer demand per day
28 patients
Line capacity per day
14 patients
Bottleneck
Coronary Stent Deployment

Reading the bottleneck

The bottleneck is "Coronary Stent Deployment": it can process 14 patients per day against a demand of 28 patients, so it falls short of demand by 51.6%. Once downtime and scrap are counted, its cycle time grows from 1,307 s to 1,655 s, against a takt of 1,221 s. The largest loss at this step is changeovers (28 min every 4 units), about 420 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Surgery, Inpatient & Outpatient Care: Surgery, Inpatient & Outpatient Care