Screening Colonoscopy & GI Endoscopy Loop

Product family: 4-Room Endoscopy Circuit.

Flow: Endoscope AER Pool → Prep Audit & IV Placement → Sedation Induction Bay → Endoscopy Room & Biopsy → Post-Sedation Recovery → Pathology Follow-Up & Exit → Screening Outpatients

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Screening Colonoscopy & GI Endoscopy LoopSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Endoscope AER Pool → Prep Audit & IV Placement (421 s) → Sedation Induction Bay (552 s) → Endoscopy Room & Biopsy (704 s) → Post-Sedation Recovery (513 s) → Pathology Follow-Up & Exit (316 s) → Screening Outpatients.SUPPLIEREndoscope AERPoolI0.60 d1Prep Audit & IVPlacementC/T 421 sI0.50 d2SedationInduction BayC/T 552 sI0.81 d3Endoscopy Room &BiopsyC/T 704 sI0.40 d4Post-SedationRecoveryC/T 513 sI0.31 d5PathologyFollow-Up & ExitC/T 316 sI0.25 dCUSTOMERScreeningOutpatients52 / patients

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Prep Audit & IV Placement421 s5 min97%96.5%1031 (0.60 d)73
2. Sedation Induction Bay552 s10 min94%95.8%1026 (0.50 d)51
3. Endoscopy Room & Biopsy704 s28 min84%94.0%842 (0.81 d)26
4. Post-Sedation Recovery513 s6 min95%98.2%521 (0.40 d)55
5. Pathology Follow-Up & Exit316 s4 min98%97.5%516 (0.31 d)96

Key figures

Takt time
658 s
Lead time
2.94 d
Value-added time
2,506 s
Process cycle efficiency (PCE)
2.5%
Rolled throughput yield (RTY)
83.2%
Customer demand per day
52 patients
Line capacity per day
26 patients
Bottleneck
Endoscopy Room & Biopsy

Reading the bottleneck

The bottleneck is "Endoscopy Room & Biopsy": it can process 26 patients per day against a demand of 52 patients, so it falls short of demand by 49.8%. Once downtime and scrap are counted, its cycle time grows from 704 s to 892 s, against a takt of 658 s. The largest loss at this step is changeovers (28 min every 8 units), about 210 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Surgery, Inpatient & Outpatient Care: Surgery, Inpatient & Outpatient Care