Fluoroscopy-Guided Spine Pain Injection Clinic

Product family: 20-Min Epidural Nerve Blocks.

Flow: Steroid Compound Pharmacy → Consent & Pain Scale Check → Prone C-Arm Table Position → Fluoroscopy Epidural Block → 15-Min Motor Check Recliner → Discharge Mobility Walk → Chronic Spine Outpatients

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Fluoroscopy-Guided Spine Pain Injection ClinicSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Steroid Compound Pharmacy → Consent & Pain Scale Check (608 s) → Prone C-Arm Table Position (798 s) → Fluoroscopy Epidural Block (1,017 s) → 15-Min Motor Check Recliner (741 s) → Discharge Mobility Walk (456 s) → Chronic Spine Outpatients.SUPPLIERSteroidCompoundPharmacyI0.61 d1Consent & PainScale CheckC/T 608 sI0.50 d2Prone C-Arm TablePositionC/T 798 sI0.81 d3FluoroscopyEpidural BlockC/T 1,017 sI0.39 d415-Min MotorCheck ReclinerC/T 741 sI0.31 d5DischargeMobility WalkC/T 456 sI0.25 dCUSTOMERChronic SpineOutpatients36 / patients

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Consent & Pain Scale Check608 s5 min97%96.5%722 (0.61 d)50
2. Prone C-Arm Table Position798 s10 min94%95.8%718 (0.50 d)35
3. Fluoroscopy Epidural Block1,017 s28 min84%94.0%529 (0.81 d)17
4. 15-Min Motor Check Recliner741 s6 min95%98.2%414 (0.39 d)39
5. Discharge Mobility Walk456 s4 min98%97.5%411 (0.31 d)67

Key figures

Takt time
950 s
Lead time
2.97 d
Value-added time
3,620 s
Process cycle efficiency (PCE)
3.6%
Rolled throughput yield (RTY)
83.2%
Customer demand per day
36 patients
Line capacity per day
17 patients
Bottleneck
Fluoroscopy Epidural Block

Reading the bottleneck

The bottleneck is "Fluoroscopy Epidural Block": it can process 17 patients per day against a demand of 36 patients, so it falls short of demand by 52.3%. Once downtime and scrap are counted, its cycle time grows from 1,017 s to 1,288 s, against a takt of 950 s. The largest loss at this step is changeovers (28 min every 5 units), about 336 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Surgery, Inpatient & Outpatient Care: Surgery, Inpatient & Outpatient Care