High-Volume Ophthalmic Cataract Day Clinic

Product family: 12-Min Phaco Lens Procedures.

Flow: Ophthalmic IOL & Viscoelastic → Visual Acuity & Biometry → Dilating Drops Pre-Op Lounge → Dual-OR Phaco Surgery → 15-Min Tea & Observation → Post-Op Drops & Driver Exit → Senior Ophthalmology Care

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: High-Volume Ophthalmic Cataract Day ClinicSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Ophthalmic IOL & Viscoelastic → Visual Acuity & Biometry (342 s) → Dilating Drops Pre-Op Lounge (449 s) → Dual-OR Phaco Surgery (572 s) → 15-Min Tea & Observation (417 s) → Post-Op Drops & Driver Exit (257 s) → Senior Ophthalmology Care.SUPPLIEROphthalmic IOL& ViscoelasticI0.59 d1Visual Acuity &BiometryC/T 342 sI0.50 d2Dilating DropsPre-Op LoungeC/T 449 sI0.80 d3Dual-OR PhacoSurgeryC/T 572 sI0.41 d415-Min Tea &ObservationC/T 417 sI0.30 d5Post-Op Drops &Driver ExitC/T 257 sI0.25 dCUSTOMERSeniorOphthalmology…64 / patients

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Visual Acuity & Biometry342 s5 min97%96.5%1338 (0.59 d)90
2. Dilating Drops Pre-Op Lounge449 s10 min94%95.8%1332 (0.50 d)63
3. Dual-OR Phaco Surgery572 s28 min84%94.0%1051 (0.80 d)32
4. 15-Min Tea & Observation417 s6 min95%98.2%626 (0.41 d)68
5. Post-Op Drops & Driver Exit257 s4 min98%97.5%619 (0.30 d)118

Key figures

Takt time
534 s
Lead time
2.90 d
Value-added time
2,037 s
Process cycle efficiency (PCE)
2.1%
Rolled throughput yield (RTY)
83.2%
Customer demand per day
64 patients
Line capacity per day
32 patients
Bottleneck
Dual-OR Phaco Surgery

Reading the bottleneck

The bottleneck is "Dual-OR Phaco Surgery": it can process 32 patients per day against a demand of 64 patients, so it falls short of demand by 49.4%. Once downtime and scrap are counted, its cycle time grows from 572 s to 724 s, against a takt of 534 s. The largest loss at this step is changeovers (28 min every 10 units), about 168 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.