Outpatient Surgery Clinical Pathway

Product family: Day-Case Outpatient Procedure.

Flow: Central Sterile Pharmacy → Patient Intake → Nursing Pre-Op Prep → Operating Theater → PACU Recovery → Medical Discharge → Outpatient Patients

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Outpatient Surgery Clinical PathwaySupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Central Sterile Pharmacy → Patient Intake (486 s) → Nursing Pre-Op Prep (638 s) → Operating Theater (813 s) → PACU Recovery (593 s) → Medical Discharge (365 s) → Outpatient Patients.SUPPLIERCentral SterilePharmacyI0.60 d1Patient IntakeC/T 486 sI0.51 d2Nursing Pre-OpPrepC/T 638 sI0.80 d3Operating TheaterC/T 813 sI0.40 d4PACU RecoveryC/T 593 sI0.31 d5Medical DischargeC/T 365 sI0.24 dCUSTOMEROutpatientPatients45 / patients

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Patient Intake486 s5 min97%96.5%927 (0.60 d)63
2. Nursing Pre-Op Prep638 s10 min94%95.8%923 (0.51 d)44
3. Operating Theater813 s28 min84%94.0%736 (0.80 d)23
4. PACU Recovery593 s6 min95%98.2%518 (0.40 d)49
5. Medical Discharge365 s4 min98%97.5%514 (0.31 d)84

Key figures

Takt time
760 s
Lead time
2.95 d
Value-added time
2,895 s
Process cycle efficiency (PCE)
2.9%
Rolled throughput yield (RTY)
83.2%
Customer demand per day
45 patients
Line capacity per day
23 patients
Bottleneck
Operating Theater

Reading the bottleneck

The bottleneck is "Operating Theater": it can process 23 patients per day against a demand of 45 patients, so it falls short of demand by 49.5%. Once downtime and scrap are counted, its cycle time grows from 813 s to 1,030 s, against a takt of 760 s. The largest loss at this step is changeovers (28 min every 7 units), about 240 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.