60,000T Panamax Port Grain Silo Discharge Hub

Product family: Wheat & Soy Bulk Handling.

Flow: Panamax Bulk Vessels → Pneumatic & Grab Unloader → Covered Belt Weigh Tower → Phyto Moisture & Mycotoxin Lab → Concrete Silo Storage Draw → Rapid Rail / Hopper Truck → National Flour & Feed Mills

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: 60,000T Panamax Port Grain Silo Discharge HubSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Panamax Bulk Vessels → Pneumatic & Grab Unloader (250 s) → Covered Belt Weigh Tower (287 s) → Phyto Moisture & Mycotoxin Lab (398 s) → Concrete Silo Storage Draw (272 s) → Rapid Rail / Hopper Truck (206 s) → National Flour & Feed Mills.SUPPLIERPanamax BulkVesselsI1.00 d1Pneumatic & GrabUnloaderC/T 250 sI2.00 d2Covered BeltWeigh TowerC/T 287 sI2.60 d3Phyto Moisture &Mycotoxin LabC/T 398 sI0.90 d4Concrete SiloStorage DrawC/T 272 sI0.50 d5Rapid Rail /Hopper TruckC/T 206 sI0.80 dCUSTOMERNational Flour& Feed Mills220 / tonnes

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Pneumatic & Grab Unloader250 s15 min93%99.1%110220 (1.00 d)292
2. Covered Belt Weigh Tower287 s10 min91%98.4%88440 (2.00 d)248
3. Phyto Moisture & Mycotoxin Lab398 s25 min82%92.0%110572 (2.60 d)148
4. Concrete Silo Storage Draw272 s8 min94%97.6%44198 (0.90 d)265
5. Rapid Rail / Hopper Truck206 s5 min97%98.6%33110 (0.50 d)367

Key figures

Takt time
368 s
Lead time
7.82 d
Value-added time
1,413 s
Process cycle efficiency (PCE)
0.22%
Rolled throughput yield (RTY)
86.3%
Customer demand per day
220 tonnes
Line capacity per day
148 tonnes
Bottleneck
Phyto Moisture & Mycotoxin Lab

Reading the bottleneck

The bottleneck is "Phyto Moisture & Mycotoxin Lab": it can process 148 tonnes per day against a demand of 220 tonnes, so it falls short of demand by 32.8%. Once downtime and scrap are counted, its cycle time grows from 398 s to 528 s, against a takt of 368 s. The largest loss at this step is equipment downtime (uptime 82%), about 87.4 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.