Widebody Freighter Air Cargo ULD Ground Hub

Product family: Express PMA & LD3 Pallets.

Flow: Cargo Airline Ramp Flights → Main-Deck Loader Tow → Bonded Cage Break-Bulk ULD → Customs & ETD Explosive Trace → Re-Weigh & Forwarder Bay → Drayage Dock Truck Outbound → Air Express Forwarders

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Widebody Freighter Air Cargo ULD Ground HubSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Cargo Airline Ramp Flights → Main-Deck Loader Tow (290 s) → Bonded Cage Break-Bulk ULD (333 s) → Customs & ETD Explosive Trace (460 s) → Re-Weigh & Forwarder Bay (315 s) → Drayage Dock Truck Outbound (239 s) → Air Express Forwarders.SUPPLIERCargo AirlineRamp FlightsI1.00 d1Main-Deck LoaderTowC/T 290 sI2.00 d2Bonded CageBreak-Bulk ULDC/T 333 sI2.60 d3Customs & ETDExplosive TraceC/T 460 sI0.90 d4Re-Weigh &Forwarder BayC/T 315 sI0.50 d5Drayage DockTruck OutboundC/T 239 sI0.80 dCUSTOMERAir ExpressForwarders190 / TEU

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Main-Deck Loader Tow290 s15 min93%99.1%95190 (1.00 d)252
2. Bonded Cage Break-Bulk ULD333 s10 min91%98.4%76380 (2.00 d)214
3. Customs & ETD Explosive Trace460 s25 min82%92.0%95494 (2.60 d)128
4. Re-Weigh & Forwarder Bay315 s8 min94%97.6%38171 (0.90 d)229
5. Drayage Dock Truck Outbound239 s5 min97%98.6%2995 (0.50 d)316

Key figures

Takt time
426 s
Lead time
7.82 d
Value-added time
1,637 s
Process cycle efficiency (PCE)
0.26%
Rolled throughput yield (RTY)
86.3%
Customer demand per day
190 TEU
Line capacity per day
128 TEU
Bottleneck
Customs & ETD Explosive Trace

Reading the bottleneck

The bottleneck is "Customs & ETD Explosive Trace": it can process 128 TEU per day against a demand of 190 TEU, so it falls short of demand by 32.7%. Once downtime and scrap are counted, its cycle time grows from 460 s to 610 s, against a takt of 426 s. The largest loss at this step is equipment downtime (uptime 82%), about 101 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.