Dedicated Fruit Terminal Reefer Pallet Discharge

Product family: Zero-Break Cold Break-Bulk.

Flow: Reefer Fruit Charter Ships → Crane Cage Reefer Unload → Pulp Temp & Agrifood Inspection → Airlock Cool-Chamber Buffer → Market Order Cross-Dock → Curtain Reefer Slot Departure → European Wholesale Markets

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Dedicated Fruit Terminal Reefer Pallet DischargeSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Reefer Fruit Charter Ships → Crane Cage Reefer Unload (38.7 s) → Pulp Temp & Agrifood Inspection (44.0 s) → Airlock Cool-Chamber Buffer (61.0 s) → Market Order Cross-Dock (42.0 s) → Curtain Reefer Slot Departure (31.8 s) → European Wholesale Markets.SUPPLIERReefer FruitCharter ShipsI1.00 d1Crane Cage ReeferUnloadC/T 38.7 sI2.00 d2Pulp Temp &Agrifood…C/T 44.0 sI2.60 d3AirlockCool-Chamber…C/T 61.0 sI0.90 d4Market OrderCross-DockC/T 42.0 sI0.50 d5Curtain ReeferSlot DepartureC/T 31.8 sI0.80 dCUSTOMEREuropeanWholesale…950 / crates

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Crane Cage Reefer Unload38.7 s15 min93%99.1%475950 (1.00 d)1,243
2. Pulp Temp & Agrifood Inspection44.0 s10 min91%98.4%3801,900 (2.00 d)1,068
3. Airlock Cool-Chamber Buffer61.0 s25 min82%92.0%4752,470 (2.60 d)631
4. Market Order Cross-Dock42.0 s8 min94%97.6%190855 (0.90 d)1,127
5. Curtain Reefer Slot Departure31.8 s5 min97%98.6%143475 (0.50 d)1,564

Key figures

Takt time
56.8 s
Lead time
7.80 d
Value-added time
218 s
Process cycle efficiency (PCE)
0.052%
Rolled throughput yield (RTY)
86.3%
Customer demand per day
950 crates
Line capacity per day
631 crates
Bottleneck
Airlock Cool-Chamber Buffer

Reading the bottleneck

The bottleneck is "Airlock Cool-Chamber Buffer": it can process 631 crates per day against a demand of 950 crates, so it falls short of demand by 33.6%. Once downtime and scrap are counted, its cycle time grows from 61.0 s to 80.9 s, against a takt of 56.8 s. The largest loss at this step is equipment downtime (uptime 82%), about 13.4 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.