Intermodal Sea-to-Rail RMG Gantry Transfer

Product family: Double-Stack Block Train Runs.

Flow: Deep-Sea Marine Quays → RMG Crane Buffer Transfer → Customs Transit T1 Guarantee → Wagon Twistlock Placement → Brake & Axle Weighbridge → Mainline Locomotive Dispatch → Inland Dry Ports

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Intermodal Sea-to-Rail RMG Gantry TransferSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Deep-Sea Marine Quays → RMG Crane Buffer Transfer (197 s) → Customs Transit T1 Guarantee (226 s) → Wagon Twistlock Placement (312 s) → Brake & Axle Weighbridge (214 s) → Mainline Locomotive Dispatch (162 s) → Inland Dry Ports.SUPPLIERDeep-Sea MarineQuaysI1.00 d1RMG Crane BufferTransferC/T 197 sI2.00 d2Customs TransitT1 GuaranteeC/T 226 sI2.60 d3Wagon TwistlockPlacementC/T 312 sI0.90 d4Brake & AxleWeighbridgeC/T 214 sI0.50 d5MainlineLocomotive…C/T 162 sI0.80 dCUSTOMERInland DryPorts280 / TEU

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. RMG Crane Buffer Transfer197 s15 min93%99.1%140280 (1.00 d)371
2. Customs Transit T1 Guarantee226 s10 min91%98.4%112560 (2.00 d)315
3. Wagon Twistlock Placement312 s25 min82%92.0%140728 (2.60 d)189
4. Brake & Axle Weighbridge214 s8 min94%97.6%56252 (0.90 d)337
5. Mainline Locomotive Dispatch162 s5 min97%98.6%42140 (0.50 d)466

Key figures

Takt time
289 s
Lead time
7.81 d
Value-added time
1,111 s
Process cycle efficiency (PCE)
0.18%
Rolled throughput yield (RTY)
86.3%
Customer demand per day
280 TEU
Line capacity per day
189 TEU
Bottleneck
Wagon Twistlock Placement

Reading the bottleneck

The bottleneck is "Wagon Twistlock Placement": it can process 189 TEU per day against a demand of 280 TEU, so it falls short of demand by 32.6%. Once downtime and scrap are counted, its cycle time grows from 312 s to 414 s, against a takt of 289 s. The largest loss at this step is equipment downtime (uptime 82%), about 68.5 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.