Coastal Chemical & Edible Oil Jetty Tank Farm

Product family: Heated Parcel Tanker Discharge.

Flow: Chemical Parcel Tankers → Nitrogen Purge & Loading Arm → Manifold Valve Line-Up & Flow → Shore-Tank Composite Lab QC → Nitrogen Blanketed Heated Tank → Rail Tank Car & Road Gantry → Chemical & Food Plants

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Coastal Chemical & Edible Oil Jetty Tank FarmSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Chemical Parcel Tankers → Nitrogen Purge & Loading Arm (1,530 s) → Manifold Valve Line-Up & Flow (1,755 s) → Shore-Tank Composite Lab QC (2,430 s) → Nitrogen Blanketed Heated Tank (1,665 s) → Rail Tank Car & Road Gantry (1,260 s) → Chemical & Food Plants.SUPPLIERChemical ParcelTankersI1.00 d1Nitrogen Purge &Loading ArmC/T 1,530 sI2.00 d2Manifold ValveLine-Up & FlowC/T 1,755 sI2.61 d3Shore-TankComposite Lab QCC/T 2,430 sI0.89 d4NitrogenBlanketed Heated…C/T 1,665 sI0.50 d5Rail Tank Car &Road GantryC/T 1,260 sI0.81 dCUSTOMERChemical & FoodPlants36 / batches

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Nitrogen Purge & Loading Arm1,530 s15 min93%99.1%1836 (1.00 d)48
2. Manifold Valve Line-Up & Flow1,755 s10 min91%98.4%1472 (2.00 d)41
3. Shore-Tank Composite Lab QC2,430 s25 min82%92.0%1894 (2.61 d)24
4. Nitrogen Blanketed Heated Tank1,665 s8 min94%97.6%732 (0.89 d)43
5. Rail Tank Car & Road Gantry1,260 s5 min97%98.6%518 (0.50 d)60

Key figures

Takt time
2,250 s
Lead time
7.91 d
Value-added time
8,640 s
Process cycle efficiency (PCE)
1.3%
Rolled throughput yield (RTY)
86.3%
Customer demand per day
36 batches
Line capacity per day
24 batches
Bottleneck
Shore-Tank Composite Lab QC

Reading the bottleneck

The bottleneck is "Shore-Tank Composite Lab QC": it can process 24 batches per day against a demand of 36 batches, so it falls short of demand by 32.7%. Once downtime and scrap are counted, its cycle time grows from 2,430 s to 3,221 s, against a takt of 2,250 s. The largest loss at this step is equipment downtime (uptime 82%), about 533 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.