Coastal Chemical & Edible Oil Jetty Tank Farm
Product family: Heated Parcel Tanker Discharge.
Flow: Chemical Parcel Tankers → Nitrogen Purge & Loading Arm → Manifold Valve Line-Up & Flow → Shore-Tank Composite Lab QC → Nitrogen Blanketed Heated Tank → Rail Tank Car & Road Gantry → Chemical & Food Plants
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Nitrogen Purge & Loading Arm | 1,530 s | 15 min | 93% | 99.1% | 18 | 36 (1.00 d) | 48 |
| 2. Manifold Valve Line-Up & Flow | 1,755 s | 10 min | 91% | 98.4% | 14 | 72 (2.00 d) | 41 |
| 3. Shore-Tank Composite Lab QC | 2,430 s | 25 min | 82% | 92.0% | 18 | 94 (2.61 d) | 24 |
| 4. Nitrogen Blanketed Heated Tank | 1,665 s | 8 min | 94% | 97.6% | 7 | 32 (0.89 d) | 43 |
| 5. Rail Tank Car & Road Gantry | 1,260 s | 5 min | 97% | 98.6% | 5 | 18 (0.50 d) | 60 |
Key figures
- Takt time
- 2,250 s
- Lead time
- 7.91 d
- Value-added time
- 8,640 s
- Process cycle efficiency (PCE)
- 1.3%
- Rolled throughput yield (RTY)
- 86.3%
- Customer demand per day
- 36 batches
- Line capacity per day
- 24 batches
- Bottleneck
- Shore-Tank Composite Lab QC
Reading the bottleneck
The bottleneck is "Shore-Tank Composite Lab QC": it can process 24 batches per day against a demand of 36 batches, so it falls short of demand by 32.7%. Once downtime and scrap are counted, its cycle time grows from 2,430 s to 3,221 s, against a takt of 2,250 s. The largest loss at this step is equipment downtime (uptime 82%), about 533 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Ports, Maritime, Air Cargo & Customs: Ports, Maritime, Air Cargo & Customs
- Container Terminal & Customs Clearance
- Ro-Ro Finished Vehicle Port Import Terminal
- Widebody Freighter Air Cargo ULD Ground Hub
- Intermodal Sea-to-Rail RMG Gantry Transfer
- Free-Trade Zone Bonded Deconsolidation Hub
- 60,000T Panamax Port Grain Silo Discharge Hub
- Overnight Express Courier Hub Cross-Belt Sort
- Dedicated Fruit Terminal Reefer Pallet Discharge
- Heavy Lift Wind Blade & Transformer Port Berth
- Inland Dry-Port Customs Clearance Rail Depot
- High-Frequency Strait Ro-Pax Freight Ferry