Overnight Express Courier Hub Cross-Belt Sort
Product family: 2:00 AM Air Freighter Wave.
Flow: Cargo Flight Ramp + Linehaul → Container Unload & Belt Induct → 5-Sided Laser Barcode Tunnel → Dual High-Speed Cross-Belt → Chute Bagging & Fly-Weight → Aircraft ULD & Van Depart → Early Morning City Vans
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Container Unload & Belt Induct | 2.0 s | 15 min | 93% | 99.1% | 9,000 | 18,000 (1.00 d) | 24,055 |
| 2. 5-Sided Laser Barcode Tunnel | 2.3 s | 10 min | 91% | 98.4% | 7,200 | 36,000 (2.00 d) | 20,439 |
| 3. Dual High-Speed Cross-Belt | 3.2 s | 25 min | 82% | 92.0% | 9,000 | 46,800 (2.60 d) | 12,023 |
| 4. Chute Bagging & Fly-Weight | 2.2 s | 8 min | 94% | 97.6% | 3,600 | 16,200 (0.90 d) | 21,518 |
| 5. Aircraft ULD & Van Depart | 1.7 s | 5 min | 97% | 98.6% | 2,700 | 9,000 (0.50 d) | 29,255 |
Key figures
- Takt time
- 3.0 s
- Lead time
- 7.80 d
- Value-added time
- 11.4 s
- Process cycle efficiency (PCE)
- 0.003%
- Rolled throughput yield (RTY)
- 86.3%
- Customer demand per day
- 18,000 orders
- Line capacity per day
- 12,023 orders
- Bottleneck
- Dual High-Speed Cross-Belt
Reading the bottleneck
The bottleneck is "Dual High-Speed Cross-Belt": it can process 12,023 orders per day against a demand of 18,000 orders, so it falls short of demand by 33.2%. Once downtime and scrap are counted, its cycle time grows from 3.2 s to 4.2 s, against a takt of 3.0 s. The largest loss at this step is equipment downtime (uptime 82%), about 0.7 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Ports, Maritime, Air Cargo & Customs: Ports, Maritime, Air Cargo & Customs
- Container Terminal & Customs Clearance
- Ro-Ro Finished Vehicle Port Import Terminal
- Widebody Freighter Air Cargo ULD Ground Hub
- Intermodal Sea-to-Rail RMG Gantry Transfer
- Free-Trade Zone Bonded Deconsolidation Hub
- 60,000T Panamax Port Grain Silo Discharge Hub
- Dedicated Fruit Terminal Reefer Pallet Discharge
- Heavy Lift Wind Blade & Transformer Port Berth
- Coastal Chemical & Edible Oil Jetty Tank Farm
- Inland Dry-Port Customs Clearance Rail Depot
- High-Frequency Strait Ro-Pax Freight Ferry