Inland Dry-Port Customs Clearance Rail Depot
Product family: Congestion-Relief Container Yard.
Flow: Shuttle Trains from Seaport → Shuttle Rail Unload & Scan → Local Customs Broker Desk → Physical Bay Container Open → Excise Tax & Gate Release → Short-Haul Truck Final Drop → Local Industrial Importers
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Shuttle Rail Unload & Scan | 175 s | 15 min | 93% | 99.1% | 105 | 210 (1.00 d) | 275 |
| 2. Local Customs Broker Desk | 201 s | 10 min | 91% | 98.4% | 84 | 420 (2.00 d) | 234 |
| 3. Physical Bay Container Open | 278 s | 25 min | 82% | 92.0% | 105 | 546 (2.60 d) | 138 |
| 4. Excise Tax & Gate Release | 190 s | 8 min | 94% | 97.6% | 42 | 189 (0.90 d) | 249 |
| 5. Short-Haul Truck Final Drop | 144 s | 5 min | 97% | 98.6% | 32 | 105 (0.50 d) | 346 |
Key figures
- Takt time
- 257 s
- Lead time
- 7.82 d
- Value-added time
- 988 s
- Process cycle efficiency (PCE)
- 0.23%
- Rolled throughput yield (RTY)
- 86.3%
- Customer demand per day
- 210 TEU
- Line capacity per day
- 138 TEU
- Bottleneck
- Physical Bay Container Open
Reading the bottleneck
The bottleneck is "Physical Bay Container Open": it can process 138 TEU per day against a demand of 210 TEU, so it falls short of demand by 34.1%. Once downtime and scrap are counted, its cycle time grows from 278 s to 369 s, against a takt of 257 s. The largest loss at this step is equipment downtime (uptime 82%), about 61.0 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Ports, Maritime, Air Cargo & Customs: Ports, Maritime, Air Cargo & Customs
- Container Terminal & Customs Clearance
- Ro-Ro Finished Vehicle Port Import Terminal
- Widebody Freighter Air Cargo ULD Ground Hub
- Intermodal Sea-to-Rail RMG Gantry Transfer
- Free-Trade Zone Bonded Deconsolidation Hub
- 60,000T Panamax Port Grain Silo Discharge Hub
- Overnight Express Courier Hub Cross-Belt Sort
- Dedicated Fruit Terminal Reefer Pallet Discharge
- Heavy Lift Wind Blade & Transformer Port Berth
- Coastal Chemical & Edible Oil Jetty Tank Farm
- High-Frequency Strait Ro-Pax Freight Ferry